Difference between revisions of "Curb cuts: Gallery"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) (Created page with "<gallery mode="packed" widths=200px heights=200px> LSRCA curb.jpg| Curb cut used as a controlled overflow route from permeable paving to a bioretention facility with monitorin...") |
Jenny Hill (talk | contribs) m |
||
Line 5: | Line 5: | ||
IMAX Stone Inlet.jpeg| Photo credit: CVC | IMAX Stone Inlet.jpeg| Photo credit: CVC | ||
</gallery> | </gallery> | ||
+ | |||
+ | [[Category:Gallery]] |
Revision as of 14:20, 17 October 2017
Curb cut into a bioretention facility in Hinsdale, IL.
Decorative aggregate in the center of the facility reduces erosion and dissipates power inflow around the inlet area. A monitoring/maintenance well can be seen in the foreground.
Photo credit: CNTCurb cut into a bioretention facility in Brown Deer, WI.
Aggregate is used to reduce erosion around the inlet area.
Photo credit: Aaron Volkening