==Infiltration Testing==
 
==Infiltration Testing==
 +
*Double ring infiltrometer
 +
*Single Ring Infiltrometer
 +
*Constant-head well permeameter
 +
*Falling-head well permeameter
 +
*Cased-borehole
 +
*Falling Head Test
 +
*Constant Head Test
 +
*Basin Flooding Test
 +
 
The preferred testing period is during April and May. If testing is conducted between June 1 and December 1, the soil should be soaked for 24 hours prior, to simulate field saturated conditions.<ref>http://www.extension.umn.edu/environment/housing-technology/moisture-management/how-to-run-a-percolation-test/index.html</ref>   
 
The preferred testing period is during April and May. If testing is conducted between June 1 and December 1, the soil should be soaked for 24 hours prior, to simulate field saturated conditions.<ref>http://www.extension.umn.edu/environment/housing-technology/moisture-management/how-to-run-a-percolation-test/index.html</ref>   
  