Line 29: |
Line 29: |
| |8.5 | | |8.5 |
| |} | | |} |
| + | |
| + | <noinclude></noinclude> |
| + | Where the mean infiltration rate measured at the proposed bottom elevation of the BMP is 30 mm/h, and the mean infiltration rate measured in an underlying soil horizon within 1.5 metres of the bottom is 12 mm/h: |
| + | :<math>ratio=\frac{q_{bottom}}{min\ q_{within 1.5m}}\ =\ \frac{30}{12}\ =2.5</math> |
| + | |
| + | From the table the SCF is 3.5, and the design infiltration rate can be calculated: |
| + | :<math>q'=\frac{q}{SCF}\ =\ \frac{30}{3.5}=\ 8.6\ mm/hr</math> |
| + | </noinclude> |