Changes

Jump to navigation Jump to search
Line 15: Line 15:  
*''A<sub>p</sub>'' = Area of the infiltration practice in m<sup>2</sup>
 
*''A<sub>p</sub>'' = Area of the infiltration practice in m<sup>2</sup>
 
*''A<sub>c</sub>'' = Catchment area in m<sup>2</sup>}}
 
*''A<sub>c</sub>'' = Catchment area in m<sup>2</sup>}}
 
+
----
 +
Apply an appropriate safety correction factor to the measured infiltration rate:
 
:<math>q'=\frac{q}{SCF}</math>
 
:<math>q'=\frac{q}{SCF}</math>
 
+
{{Plainlist|1=Where:
 +
*''q''' = Infiltration coefficient in mm/hr (accounting for SCF)
 +
*''SCF'' = Safety correction factor}}
 +
----
      Line 33: Line 37:  
*''i'' = Intensity of design storm in mm/hr
 
*''i'' = Intensity of design storm in mm/hr
 
*''q''' = Infiltration coefficient in mm/hr (accounting for SCF)
 
*''q''' = Infiltration coefficient in mm/hr (accounting for SCF)
*''SF'' = Safety factor
+
*''SCF'' = Safety correction factor
 
*''V<sub>R</sub>'' = Void ratio (porosity), as measured (or default to 0.35 for all aggregates)*
 
*''V<sub>R</sub>'' = Void ratio (porosity), as measured (or default to 0.35 for all aggregates)*
 
*''R'' = Ratio of catchment area (''A<sub>c</sub>'') to BMP footprint area (A<sub>p</sub>) syn. I/P ratio.   
 
*''R'' = Ratio of catchment area (''A<sub>c</sub>'') to BMP footprint area (A<sub>p</sub>) syn. I/P ratio.   
8,255

edits

Navigation menu