− | '''<h3>LID opportunities in parks</h3>''' [[File:Example.jpg|thumb|upright=0.6|The bioretention area installed at O’Connor Park | + | '''<h3>[[LID opportunities in parks]]</h3>''' [[File:Example.jpg|thumb|upright=0.6|The bioretention area installed at O’Connor Park |
| in Mississauga is part of a stormwater management system | | in Mississauga is part of a stormwater management system |
| that treats parking lot runoff prior to discharging to a local | | that treats parking lot runoff prior to discharging to a local |
Line 53: |
Line 53: |
| roadwork, will affect the operation of LID practices in the park. | | roadwork, will affect the operation of LID practices in the park. |
| <br><br> | | <br><br> |
− | '''<h3>Inter-municipal transfer of funds</h3>''' Integrating LID practices into the municipal stormwater | + | '''<h4>Inter-municipal transfer of funds</h4>''' Integrating LID practices into the municipal stormwater |
| management framework may change how municipal funds are | | management framework may change how municipal funds are |
| managed. Traditional stormwater management maintenance | | managed. Traditional stormwater management maintenance |
Line 67: |
Line 67: |
| <br><br> | | <br><br> |
| | | |
− | '''<h3>Source Areas</h3>''' [[File:Example3.jpg|thumb|upright=0.6|The road surface (left) contributes significantly | + | '''<h4>Source Areas</h4>''' [[File:Example3.jpg|thumb|upright=0.6|The road surface (left) contributes significantly |
| more stormwater pollutants than the parkland area (right). To | | more stormwater pollutants than the parkland area (right). To |
| achieve maximum watershed benefit a designer could consider | | achieve maximum watershed benefit a designer could consider |
Line 104: |
Line 104: |
| !colspan="3" style="background: brown; color: white"|'''o Unlikely''' | | !colspan="3" style="background: brown; color: white"|'''o Unlikely''' |
| |} | | |} |
− | '''<h3>Making it happen: Approaches to getting LID into parks </h3>''' | + | '''<h3>[[Making it happen: Approaches to getting LID into parks]] </h3>''' |
| | | |
| The scale of your LID project will largely determine how you | | The scale of your LID project will largely determine how you |
Line 168: |
Line 168: |
| For example, installing bioretention, infiltration chambers, | | For example, installing bioretention, infiltration chambers, |
| or permeable pavement in a parking lot requires removal of | | or permeable pavement in a parking lot requires removal of |
− | existing pavement. Budget and resources set aside for parking | + | existing pavement. Budget and resources set aside for parking lot replacement could be transferred to a retrofit project that |
| + | includes replacement of this infrastructure.<br> |
| + | '''<h4>Involvement of consultants and contractors</h4>''' |
| + | Consultants are required for large-scale retrofit projects, |
| + | specifically for the final screening of options, pre-design, |
| + | detailed design, tender and contract documents, construction |
| + | supervision and administration, and assumption and |
| + | verification. Site contractors are also required for large-scale LID retrofits. |
| + | Ideally, contractors should be pre-qualified based on previous |
| + | experience with similar LID projects. |
| + | <br> |
| + | '''<h4>More intensive public consultation</h4>''' |
| + | Stakeholders must be closely involved in the retrofit process |
| + | for large-scale LID projects. These projects have longer |
| + | construction windows, may have significant impacts on longterm |
| + | public use patterns of the park, and will cost significantly |
| + | more taxpayer dollars. |
| + | Gaining public insight in advance of LID implementation can |
| + | help address public concerns and information gaps, as well as |
| + | identify public supporters and champions. Public consultation |
| + | can help designers tailor the project to address community |
| + | concerns and values. [[File:Example5.jpg|thumb|upright=0.6|When installing new parks equipment, consider whether the LID practices can be integrated into the design. Here a |
| + | bioswale has been built into the landscape between a playground and sidewalk. (Source: CVC)]] |
| + | |
| + | '''<h4>External approvals</h4>''' |
| + | Large-scale park retrofits may require a variety of approvals |
| + | at the municipal, watershed, provincial, and/or federal level. |
| + | Since LID is still relatively new, you may encounter policies |
| + | or bylaws that present barriers to LID retrofit projects. |
| + | Alternatively, the municipality may have to enforce some |
| + | policies and bylaws to facilitate the implementation of LID |
| + | projects within parks. |
| + | <br> |
| + | '''<h4>Next Steps</h4>''' |
| + | After reading this chapter you should know how to select the |
| + | right LID practice for your site. You should also be familiar |
| + | with the details you need to consider before undertaking an |
| + | LID retrofit. |