Changes

Jump to navigation Jump to search
Line 77: Line 77:     
==Data Analysis/Modelling==
 
==Data Analysis/Modelling==
Suggest detailed modelling to evaluate how source and conveyance controls could provide a flood control function
+
*Suggest detailed modelling to evaluate how source and conveyance controls could provide a flood control function
Fieldwork
+
*Fieldwork
Visit sites to record information/interview designer/landowner
+
*Visit sites to record information/interview designer/landowner
Technical Input/Design Considerations
+
*Technical Input/Design Considerations
If flood control is your goal how does that impact other performance measures?
+
*If flood control is your goal how does that impact other performance measures?
How do other combinations of infrastructure impact effectiveness?  For example, underdrains, ponding overflow drains, and inlets/outlets may significantly reduce the effectiveness of the practice to retain runoff and also increase costs?
+
*How do other combinations of infrastructure impact effectiveness?  For example, underdrains, ponding overflow drains, and inlets/outlets may significantly reduce the effectiveness of the practice to retain runoff and also increase costs?
How would we have designed Elm Drive differently?
+
*How would we have designed Elm Drive differently?
Reducing the potential to mobilize and wash out soil media and erode the practice (this was a big concern raised by Mississauga with the LRT)
+
*Reducing the potential to mobilize and wash out soil media and erode the practice (this was a big concern raised by Mississauga with the LRT)
Inlet design to accept the minor and major system
+
*Inlet design to accept the minor and major system
How to incorporate emergency overflow structures into the design?
+
*How to incorporate emergency overflow structures into the design?
What features can be incorporated to all you to adjust the infrastructure?
+
*What features can be incorporated to all you to adjust the infrastructure?
Operation & Maintenance considerations
+
===Operation & Maintenance considerations===
Reporting
  −
Literature Review Summary
  −
TOC/Outline
  −
First Draft
  −
Second Draft
  −
Final
  −
Meeting with Executive Planning Committee (@TRCA)
  −
5 meetings
  −
Webinar with CO
  −
Planning Webinar
  −
Attend Webinar
  −
Internal CVC
  −
Chapter coordination etc.
  −
 
  −
 
  −
 
      
Check for related content on [[Peak flow]]
 
Check for related content on [[Peak flow]]
8,255

edits

Navigation menu