Difference between revisions of "User talk:Jenny Hill"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
(Created page with "{{plainlist| *Five percent of the average annual yield can be estimated: *<strong>Y<sub>0.05</sub>= A × C<sub>vol, A</sub> × R<sub>a</sub> × e × 0.05</strong> *Y<sub>...")
(No difference)

Revision as of 00:34, 12 August 2017

  • Five percent of the average annual yield can be estimated:
  • Y0.05= A × Cvol, A × Ra × e × 0.05
  • Y0.05 = Five percent of the average annual yield (L)
  • A = The catchment area (m2)
  • Cvol, A = The annual runoff coefficient for the catchment
  • Ra = The average annual rainfall depth (mm)
  • e = The efficiency of the pre-storage filter

Here is the first unnamed parameter of the template

  • Five percent of the average annual yield can be estimated
  • e = The efficiency of the pre-storage filter

Here is the parameter that is named class woo Here is the parameter that is named wibble {{{wibble}}} Here is the parameter that is named pipe gurgle