Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1:  
Common construction pitfalls can be avoided with careful construction supervision that focuses on the following aspects:
 
Common construction pitfalls can be avoided with careful construction supervision that focuses on the following aspects:
<table table class = table table-bordered table-condensed>
+
<table class = table-bordered>
 
<tr><th colspan =2 text = success>Erosion and Sediment Control</th></tr>
 
<tr><th colspan =2 text = success>Erosion and Sediment Control</th></tr>
 
<tr><td width = "5%"></td><td>Bioretention locations should be blocked from construction traffic and should not be used for erosion and sediment control</td></tr>
 
<tr><td width = "5%"></td><td>Bioretention locations should be blocked from construction traffic and should not be used for erosion and sediment control</td></tr>
Line 23: Line 23:  
<tr><td width = "5%"></td><td>Outfall protection/energy dissipation at concentrated inflow should be stable</td></tr>
 
<tr><td width = "5%"></td><td>Outfall protection/energy dissipation at concentrated inflow should be stable</td></tr>
 
<tr><td></td><td>Flow should not concentrate and should spread evenly over the filter bed</td></tr>
 
<tr><td></td><td>Flow should not concentrate and should spread evenly over the filter bed</td></tr>
<tr><td></td><td>Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event. The biomedia should fully drain within a maximum period of 72 hours</td></tr>
+
<tr><td></td><td>Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event. <br> The biomedia should fully drain within a maximum period of 72 hours</td></tr>
 
<tr><td></td><td>Excessive sediment accumulation should not be present</td></tr>
 
<tr><td></td><td>Excessive sediment accumulation should not be present</td></tr>
 
</table>
 
</table>
8,255

edits

Navigation menu