The extent of turbidity monitoring and methods used on a given construction project should be based on erosion risk, receiving water flows, presence of species at risk, and type and location of discharge points.
+
The extent of turbidity [[monitoring]] and methods used on a given construction project should be based on erosion risk, receiving water flows, presence of species at risk, and type and location of discharge points.
 
{{textbox|The monitoring program for sites applying the receiving water target should include the following components:  
 
{{textbox|The monitoring program for sites applying the receiving water target should include the following components:  
 
*One continuous online turbidity monitoring station 5 to 15 m downstream of the last site discharge point.  
 
*One continuous online turbidity monitoring station 5 to 15 m downstream of the last site discharge point.  