Difference between revisions of "Protecting LID features during construction: Gallery"
Jump to navigation
Jump to search
ChristineLN (talk | contribs) |
ChristineLN (talk | contribs) |
||
| Line 1: | Line 1: | ||
| − | <gallery mode=" | + | <gallery mode="slideshow" widths=200px heights=200px> |
|Keep LID perimeter controls in working order throughout construction. | |Keep LID perimeter controls in working order throughout construction. | ||
Screenshot 2025-11-12 114624.png|Protect LID inlets. | Screenshot 2025-11-12 114624.png|Protect LID inlets. | ||
| Line 7: | Line 7: | ||
Screenshot 2025-11-12 140513.png|Avoid using LID areas as temporary detention basins, but in cases where flow cannot be routed around LID areas, protection should be used to prevent accumulated sediment from migrating into the subgrade. | Screenshot 2025-11-12 140513.png|Avoid using LID areas as temporary detention basins, but in cases where flow cannot be routed around LID areas, protection should be used to prevent accumulated sediment from migrating into the subgrade. | ||
Screenshot 2025-11-12 115129.png|Be mindful of stockpile locations relative to LID areas. | Screenshot 2025-11-12 115129.png|Be mindful of stockpile locations relative to LID areas. | ||
| − | Screenshot 2025-11-12 115243.png||Inspect LID areas during ESC site inspections | + | Screenshot 2025-11-12 115243.png||Inspect LID areas during ESC site inspections. |
</gallery> | </gallery> | ||
[[category:gallery]] | [[category:gallery]] | ||