|Keep LID perimeter controls in working order throughout construction.
Screenshot 2025-11-12 114624.png|Protect LID inlets.
Screenshot 2025-11-12 114809.png|Avoid heavy equipment on infiltration areas (i.e., driving vehicles through filter beds, or over granular water storage and bedding layers). Identify and mark LID areas to increase awareness.
Screenshot 2025-11-12 113721.png|Phase construction so that LID measures are constructed last. Underground LID features can be built early in the construction process, provided they are protected by a barrier such as a plug.
Screenshot 2025-11-12 115000.png|Keep LID installations offline via flow diversion until construction is complete, the drainage area is stabilized, and vehicle mud tracking is stopped.
|Avoid using LID areas as temporary detention basins, but in cases where flow cannot be routed around LID areas, protection should be used to prevent accumulated sediment from migrating into the subgrade.
Screenshot 2025-11-12 115129.png|Be mindful of stockpile locations relative to LID areas.
Screenshot 2025-11-12 115243.png||Inspect LID areas during ESC site inspections