Changes

Jump to navigation Jump to search
no edit summary
Line 369: Line 369:  
An [https://www.mississauga.ca/file/COM/Sample-Spill-Response-Plan.pdf example spill response/reporting plan by the City of Mississauga] for small, medium, and large spills is available for download (downward facing arrow on the top righthand side) and printing (Printer emoticon on top right hand side) on the right.
 
An [https://www.mississauga.ca/file/COM/Sample-Spill-Response-Plan.pdf example spill response/reporting plan by the City of Mississauga] for small, medium, and large spills is available for download (downward facing arrow on the top righthand side) and printing (Printer emoticon on top right hand side) on the right.
   −
=Plan Submission and Approval=
+
==Plan Submission and Approval==
 
The submission requirements for erosion and sediment control strategies are organized based on three planning stages: early, intermediate, and late, which align with both the land-use and infrastructure planning processes. Each stage builds on the previous one, helping to gradually refine ESC strategies as more project details become available.  
 
The submission requirements for erosion and sediment control strategies are organized based on three planning stages: early, intermediate, and late, which align with both the land-use and infrastructure planning processes. Each stage builds on the previous one, helping to gradually refine ESC strategies as more project details become available.  
 
{{textbox|*In the early stage, the focus is on high-level planning, identifying potential impacts, and committing to appropriate ESC approaches.  
 
{{textbox|*In the early stage, the focus is on high-level planning, identifying potential impacts, and committing to appropriate ESC approaches.  

Navigation menu