'''Stormwater Management Strategy''' | '''Stormwater Management Strategy''' | ||
#A series of sub-surface infiltration chambers providing on-site retention/infiltration of the 5mm storm, water balance to reduce runoff volumes, and storage of the 100-year storm; | #A series of sub-surface infiltration chambers providing on-site retention/infiltration of the 5mm storm, water balance to reduce runoff volumes, and storage of the 100-year storm; | ||
| − | #Quality treatment provided using an | + | #Quality treatment provided using an oil/grit separator immediately upstream of each of the infiltration chambers, filtration through the infiltration chamber, and finally a stormwater management facility provided prior to discharging from the site. |
#Final erosion control provided within the stormwater management facility, controlling release rates to maintain the existing condition erosion exceedance values. | #Final erosion control provided within the stormwater management facility, controlling release rates to maintain the existing condition erosion exceedance values. | ||
#Final design required both LIDs to reduce the overall runoff volumes, but also sub-surface storage chambers to provide quantity control for rare storm events up to the 100-year design storm. Due to large area required for truck parking, limited opportunities for more landscaping to promote [[evapotranspiration]], runoff volumes increased beyond ability of LIDs to negate the need for quantity control. | #Final design required both LIDs to reduce the overall runoff volumes, but also sub-surface storage chambers to provide quantity control for rare storm events up to the 100-year design storm. Due to large area required for truck parking, limited opportunities for more landscaping to promote [[evapotranspiration]], runoff volumes increased beyond ability of LIDs to negate the need for quantity control. | ||
Revision as of 13:44, 25 September 2025
Overview[edit]
Flooding is a major environmental and economic challenge, particularly in urban areas where impervious surfaces prevent natural infiltration. Flooding can result in traffic interruption, economic loss, infrastructure damage, basement flooding and other undesirable consequences. Climate change is increasing the frequency and intensity of extreme rainfall events, exacerbating flood risks. This will be particularly severe in older areas where the minor system was not designed to today’s standards and/or major drainage system pathways have been altered or do not exist. Catastrophic losses from flooding have been steadily rising in Canada over the last two decades.
"Hydrological changes associated with urbanization are increased storm runoff volumes and peak flows, faster flow velocities and shorter time of concentrations. A reduction in infiltration generally leads to less groundwater recharge and baseflow. The flashy response results in tremendous stresses for the urban stream and downstream receiving areas" (Walsh et al., 2005)[3]
In order to protect downstream properties from flooding due to upstream development, Conservation Authorities establish flood control for future stormwater management planning through regularly updated Hydrologic and Subwatershed Studies that characterize flood flow rates, define the location and extent of flood-prone areas, and assess the potential impact of further urbanization.
Flood mitigation strategies that incorporate Low Impact Development (LID), traditional stormwater management, and hybrid infrastructure can manage stormwater effectively and reduce flood impacts.
Types of flooding[edit]
| Pluvial (surface) flooding |
Street flooding in Mississauga (The Pointer, 2023)[4]. |
|
|---|---|---|
| Fluvial (riverine) flooding | Don River floods DVP (City News, 2024)[5] |
|
| Coastal (shoreline) flooding | Lake Ontario floods Toronto Island (Toronto Life, 2017)[6] |
|
Mitigative strategies[edit]
Effective flood mitigation strategies fall into three categories: grey infrastructure (traditional engineered solutions), green infrastructure (nature-based solutions), and grey-green hybrids. Cities typically combine measures based on local flood risks, scale, and desired co-benefits such as water quality improvement and urban cooling.
Grey infrastructure solutions[edit]
| Strategy | Flood Mitigation | Additional Benefits |
|---|---|---|
| Detention ponds & stormwater basins | Store excess runoff, release gradually | Can improve water quality if designed with wetlands |
| Underground stormwater storage | Prevents sewer overflows, reduces localized flooding | Can integrate water treatment (e.g., Toronto’s Western Beaches Storage Tunnel) |
| Levees & floodwalls | Protect against riverine/coastal flooding; also used around buildings for surface flooding | Can be temporarily erected around buildings in response to floods |
Green infrastructure solutions[edit]
LIDs are well suited to address flooding because they can be fit into small areas that may have increased flood risk.
| Strategy | Flood Mitigation | Additional Benefits |
|---|---|---|
| Bioretention | Reduces peak flow, increases infiltration | Improves water quality |
| Permeable pavements | Allows infiltration, reduces runoff | Reduces heat island effect |
| Green roofs | Absorb rainfall, delay runoff | Urban cooling, energy savings |
| Riparian buffers | Protect banks, reduce erosion | Habitat, water quality protection |
| Constructed wetlands | Retain/filter stormwater | Habitat, recreation |
| Rainwater harvesting | Collects precipitation, reduces runoff | Water reuse |
| Rain gardens | Reduces on-site runoff | Aesthetic value, pollinator habitat |
Hybrid approaches[edit]
Combining green and grey infrastructure enhances flood resilience. Examples include:
| Strategy | Benefits |
|---|---|
| Stormwater tunnels + LID | Large-scale storage integrated with distributed LID practices. |
| Green streets with subsurface storage | Maximizes infiltration while providing underground detention. |
| Floodable parks / multi-use public spaces | Parks or plazas designed to temporarily store stormwater during extreme rainfall. |
| River restoration with levee setbacks | Reconnecting rivers to expanded floodplains while using engineered levees for protection |
Modelling Flood Mitigation Potential of Conventional LIDs[edit]
TRCA conducted modeling to evaluate the capacity of different stormwater management measures (LID and Ponds) to mitigate impacts of development on the peak flow and runoff volume. A sub-catchment in Humber River was selected that has an area of 35.7 ha. The existing land use in the sub-catchment is agriculture and the proposed future land use is employment land with 91% total imperviousness.
Hydrological model runs were carried out by integrating different stormwater management measures (LID and SWM Pond) for 2-year and 100-year 6-hr AES design storms.
Scenarios evaluated include:
- LID measures that provide 25 mm on-site retention
- SWM pond to control post-development peak flows to pre-development peak flows.
- Combination of scenario 1 and scenario 2
Runoff volume and peak flow reductions were calculated:
Peak Flow[edit]
- The 25 mm on-site retention using LID measures reduced post-development peak flows generated from 2 to 5 year design storms by over 26%,
- For 50 and 100 year design storms it reduces only 4% and 1% respectively.
This shows that LID designed for frequent flows will not significantly reduce the post-development peak flows generated from major storms. In order to meet flood control requirements, traditional LID need to be augmented by some flood storage measures such as dry ponds or underground storage. LIDs can be designed with increased temporary storage to increase detention times. This allows them to function more like underground end-of-pipe facilities (see Honda case study below).
Runoff Volume[edit]
- The 25 mm on-site retention using LID measures can reduce post-development runoff volume generated from 2 to 5 year design storms by over 52 %,
- For 50 and 100 year design storms, runoff volumes are reduced by 33% and 30%, respectively
This shows that the post-development runoff volume generated from major storms conveyed to receiving features can be reduced considerably by implementing LID designed to retain 25 mm.
LID Design for Flood Control[edit]
Active storage volume[edit]
LID practices are typically designed to manage more frequent and lower magnitude rainfall events. They work by detaining runoff and releasing it slowly over time. However, larger events can overwhelm the capacity of LID practices. Once their storage capacity is full, the overflow rapidly discharges excess water into storm sewers, thus limiting their ability to mitigate large flood events. LID designed for flood control should integrate large active storage volumes to temporarily store stormwater and slowly release it to streams or downstream sewer systems. The mechanisms by which conventional wet ponds and hybrid stormwater infiltration trench/bioretention facility provide this temporary storage are shown in the figures below:
Kim & Han (2008)[12] and Han & Mun (2011)[13] conducted studies in Seoul, South Korea, to assess the extent to which the installation of rainwater harvesting cisterns could help mitigate existing urban flooding problems without expanding the capacity of the existing urban drainage system. System operational data showed that 29 mm of rainwater storage per square meter of impervious area (3000 m3 cistern in this instance) provided sufficient storage for a one in 50 year period storm without the need to upgrade downstream sewers designed to 10 year storm capacity. Stormwater chambers, infiltration chambers, bioretention and other LID systems designed with large volumes of temporary storage could have similar benefits, while also reducing runoff volumes and providing other co-benefits.
Intensity-Duration-Frequency Curves[edit]
Intensity–Duration–Frequency (IDF) curves are a standard tool in hydrology that describe the statistical relationship between rainfall intensity, storm duration, and frequency of occurrence (return period) to determine the likelihood of extreme rainfall events (Martel et al., 2021)[16].
- Intensity: the rate of rainfall (mm/hr)
- Duration: the length of the rainfall event (minutes to days)
- Frequency: how often a given storm is expected to occur (e.g., a 10-year storm has a 10% chance of occurring in any given year)
IDF curves are developed from long-term rainfall records and models and are widely used to estimate design storms for stormwater management. IDF curves are crucial for sizing LID BMPs because they:
- Define design storms: LIDs must be able to manage runoff from specific return-period events (e.g., 2-year or 10-year storms). IDF curves provide the rainfall intensity and depth to use for those design events.
- Determine runoff volumes: By applying rainfall depth (from IDF data) to a given catchment, the stormwater volume that LIDs need to capture, infiltrate, or detain can be estimated (USDA, 2021)[17].
- Assess peak flows: LID facilities are often designed to reduce peak discharge. IDF curves help simulate storm hydrographs and assess how much peak flow reduction is required (City of Toronto, 2006) [18].
- Account for climate change: Historical data is no longer an accurate predictor of future extreme rainfall (CSA, 2025)[19]. Since IDF curves are based on historical data, climate change-scaled IDFs can be used to design LIDs that are resilient under future rainfall conditions (ECCC, 2025)[15].
To read about IDF curves and best practices, visit:
- https://climatedata.ca/interactive/idf-curves-101/
- https://climatedata.ca/resource/best-practices-for-using-idf-curves/
For more information on IDF curves in relation to climate change, click here.
Pre-treatment[edit]
When designing LID for flood control it is important to consider the need to not only provide extended detention storage but also a means for water to enter the storage reservoir quickly. Incoming flows should also be pre-treated to avoid clogging of media and drainage pipes. Such pre-treatment can be achieved through OGS, catchbasin inserts or high flow cobble inlets, among others. The storage media in the LID facility should have a high void ratio to reduce the potential for clogging with fine sediment that may bypass the inlet pre-treatment controls.
Case Studies[edit]
Below are examples of where LID practices with quantity control components have been used for achieving flood control.
Example 1: Honda Canada Head Office[edit]
The headquarters of Honda Canada is located at 180 Honda Boulevard in Markham, Ontario. The 17.9 ha catchment is divided up into three subcatchments with separate outlets: west (6.3 ha, 53% impervious), Northeast (5.4 ha, 55% impervious), Southeast (6.4 ha, 83% impervious). Overall site imperviousness is 64%. LID practices replaced the need for a stormwater pond, allowing the facility to maintain a large sports field in the northeast portion of the site.
Stormwater Management Criteria
- Quantity Control – meet 100 year storm
- Quality Control – 80% TSS Removal;
- Water Balance – on site retention of first 5 mm of rainfall
- Stream erosion control, 25mm storm released over 72 hours, on-site retention of the first 5mm of rainfall
Stormwater Management Strategy
- The primary practices to achieve on-site runoff retention and peak flow attenuation include a series of large gravel trenches with underdrains (mostly in the SE catchment), a 636 m3 cistern draining water from a 2.4 hectare roof, a small dry pond, permeable pavers and surface swales.
- Underdrain in the trenches is raised 0.15 m off the native soil to provide quality and water balance control through infiltration. Trees and vegetation on top of the gravel filled trenches help reduce runoff through evapotranspiration.
- Underdrain is undersized to increase detention times during flood events. Orifice controls are installed in the downstream sewer to control release rates.
- An automated irrigation system for the playing field and vegetated areas draws stored water from the rainwater cistern to increase capacity during storm events. Outside of the growing season, rainwater from the cistern drains directly to a dry pond which provides temporary storage and release.
Monitoring and Modelling Results
STEP/TRCA conducted a hydrologic monitoring and modelling study of the site in 2012/13 with researchers from The Metropolitan University to assess runoff volume and peak flow reductions. Results showed that, relative to a conventional stormwater approach without LID, runoff was reduced over the study period by between 30% and 35% for the entire site, and by between 58 and 62% in the catchment with a higher density of LID practices. Peak flows were also reduced by 73 to 78%. In the Northeast catchment, 20% of rainfall harvested from the roof was stored and reused for irrigation during the summer months. This reuse volume represented 6% of total site rainfall over 8 months. A hydrologic model calibrated using monitored data showed that the stormwater management system met the design objective of providing quantity control for the post development 100 year storm.
Example 2: Wychwood Subdivision in Brampton[edit]
The Wychwood subdivision is located on Walnut Road in Brampton. The 70 lot residential development covers an area of approximately 5 hectares and has an overall imperviousness of 47%.
Stormwater Management Criteria
- Quantity Control – reduce 2 to 100 year flows to pre-development levels
- Quality Control – 80% TSS Removal;
- Water Balance – match pre-development infiltration volumes
- Stream Erosion control: Manage, detain or re-use all rainfall up to 15 mm over the entire site
Stormwater Management Strategy
- East portion of the site controls minor and major flows through a long bioswale adjacent to the rail line. Driveways are permeable and added top soil helps improve retention of runoff from roofs, which drain to the lawns.
- West portion of the site controls runoff through infiltration swales with orifice controls on underdrains and lot level rain gardens
- All runoff is controlled by LID practices (no dry/wet ponds or underground tanks)
Monitoring and Modelling Results
- There was 125 rain events monitored and 41 composite samples collected. Modelling was used to determine inflow volumes/rates and water equality loading.
- Low impact development features provide 77 percent volume reductions for events up to 25mm
- TSS load reductions were reduced by 84%
- Event greater than 30 mm showed peak flow reductions of 74%, with a total volume reduction of 59%
- Modelling pre and post development peak flow rates indicated that peak flow targets were met for the 2 to 50 year storms but post development peak flows were *10% greater than pre development peak flows for the 100 year storm.
Example 3: Costco Distribution Centre[edit]
Costco Distribution Centre located within Block 59, Vaughan (City of Vaugh, 2024)[23]. The site has 26.4 ha and the land use is commercial site with an average site imperviousness of approximately 90%;
Stormwater Management Criteria
- Quantity Control – meet Humber River Unit Release Rates;
- Quality Control – 80% TSS Removal;
- Water Balance – Best Efforts to match post to pre;
- Erosion control, 25mm erosion storm released over 72 hours, on-site retention of the first 5mm of rainfall
Stormwater Management Strategy
- A series of sub-surface infiltration chambers providing on-site retention/infiltration of the 5mm storm, water balance to reduce runoff volumes, and storage of the 100-year storm;
- Quality treatment provided using an oil/grit separator immediately upstream of each of the infiltration chambers, filtration through the infiltration chamber, and finally a stormwater management facility provided prior to discharging from the site.
- Final erosion control provided within the stormwater management facility, controlling release rates to maintain the existing condition erosion exceedance values.
- Final design required both LIDs to reduce the overall runoff volumes, but also sub-surface storage chambers to provide quantity control for rare storm events up to the 100-year design storm. Due to large area required for truck parking, limited opportunities for more landscaping to promote evapotranspiration, runoff volumes increased beyond ability of LIDs to negate the need for quantity control.
Example 4. West Gormley, Town of Richmond Hill[edit]
Residential development consisting of low and medium density land-use is implemented on the site. Average site imperviousness is approximately 60%;
Stormwater Management Criteria
- Quantity Control – Rouge River – match post development peak flow rates to pre-development;
- Quality Control – 80% TSS Removal;
- Water Balance –Match post development water budget to pre-development;
- Erosion Control – Southern portion of site discharging to a natural dry valley feature. Feature and contributing drainage area consists of very sandy soil, producing no runoff until a greater than 25-year storm event.
- Therefore, development discharging to dry valley needed to match runoff volumes, or have no runoff from development area for storms less than 25-year design storm.
Stormwater Management Strategy
- Use a combination of increased topsoil depths, perforated storm sewers, stormwater management facility, and an infiltration facility to provide quality, quantity, and reduce runoff volumes to match pre-development.
- Even with favorable soils and maximum use of infiltration techniques, site still requires quantity control storage for large storm events.
Example 5: 3775-4005 Dundas St West (includes 2-6 Humber Hill Ave), Toronto[edit]
The size of the site is 0.53 ha. The site currently developed as commercial and residential. Proposed high rise (11-storeys) residential building with 3 levels of underground parking Proposed average site imperviousness is 90% (excluding uncontrolled buffer area 0.22 ha)
Stormwater Management Criteria
- Quantity Control – not requirement as drains to Lower Humber River
- Quality Control – 80% TSS Removal
- Water balance/Erosion Control – Retention of 5 mm event on-site
Stormwater Strategy
- Large portion of the roof proposed as green roof and cistern proposed in underground parking to capture remaining volume to meet 5 mm target. Water to be used for irrigation and carwash stations.
- Quality target achieved as majority of site is ‘clean’ roof water or directed to pervious area. Underground storage tank provided to satisfy municipal release rates to receiving storm sewer system.
- Final design required both LIDs to reduce the overall runoff volumes, but also sub-surface storage chambers to provide quantity control to meet municipal requirements.
- Due to underground parking limited opportunities for infiltration LIDs but used green roof to promote evapotranspiration, and cistern to reduce runoff volumes.
Data Analysis/Modelling[edit]
- Suggest detailed modelling to evaluate how source and conveyance controls could provide a flood control function
- Fieldwork
- Visit sites to record information/interview designer/landowner
- Technical Input/Design Considerations
- If flood control is your goal how does that impact other performance measures?
- How do other combinations of infrastructure impact effectiveness? For example, underdrains, ponding overflow drains, and inlets/outlets may significantly reduce the effectiveness of the practice to retain runoff and also increase costs?
- How would we have designed Elm Drive differently?
- Reducing the potential to mobilize and wash out soil media and erode the practice (this was a big concern raised by Mississauga with the LRT)
- Inlet design to accept the minor and major system
- How to incorporate emergency overflow structures into the design?
- What features can be incorporated to adjust the infrastructure?
Check for related content on Peak flow
References[edit]
- ↑ : Kumar, N., Liu, X., Narayanasamydamodaran, S., Pandey, K.K. 2021. A Systematic Review Comparing Urban Flood Management Practices in India to China’s Sponge City Program. Sustainability, 13, 6346. https://doi.org/10.3390/su13116346
- ↑ Insurance Bureau of Canada (IBC). 2022. Severe Weather in 2021 Caused $2.1 Billion in Insured Damage." News & Insights. Accessed: https://www.ibc.ca/news-insights/news/severe-weather-in-2021-caused-2-1-billion-in-insured-damage
- ↑ Walsh, C. J., A. S. Sharpe, and D. A. Burns. 2005. "The urban stream syndrome: Current knowledge and the search for a cure." Journal of the North American Benthological Society 24(3): 706–723. https://doi.org/10.1899/04-028.1
- ↑ The Pointer. 2013. Reflecting on the devastating 2013 storm, Mississauga takes lead in municipal flood resilience. https://thepointer.com/article/2023-07-30/reflecting-on-the-devastating-2013-storm-mississauga-takes-lead-in-municipal-flood-resilience
- ↑ City News. 2024. From the scene: Don Valley River floods section of DVP, stranding drivers. https://www.youtube.com/watch?v=fbyaYZy0d0A&t=68s
- ↑ Toronto Life. 2017. Flooding on the Toronto Islands is terrible—but also weirdly beautiful. https://torontolife.com/life/flooding-toronto-islands-terrible-also-weirdly-beautiful/
- ↑ McNally. 2017. Western Beaches Tunnel – Toronto, ON. http://mcnally.ca/tunneling-projects/western-beaches-tunnel-toronto/#:~:text=Project%20Outline,pump%20station%20at%20Strachan%20Avenue.
- ↑ Reduce Flood Risk. 2022. Construct a floodwall barrier. https://www.reducefloodrisk.org/mitigation/construct-a-floodwall-barrier/
- ↑ Michael Van Valkenburgh Associates Inc. ND. Corktown Common. https://www.mvvainc.com/projects/corktown-common
- ↑ Ontario Ministry of Environment. 2003. Stormwater Management Planning and Design Manual. https://www.ontario.ca/document/stormwater-management-planning-and-design-manual/stormwater-management-plan-and-swmp-design
- ↑ https://www.toronto.ca/ext/digital_comm/pdfs/transportation-services/green-streets-technical-guidelines-document-v2-17-11-08.pdf
- ↑ Kim, Y., & Han, M. (2008). Rainwater storage tank as a remedy for a local urban flood control. Water Science and Technology: Water Supply, 8(1), 31-36.
- ↑ Han, M. Y., & Mun, J. S. (2011). Operational data of the Star City rainwater harvesting system and its role as a climate change adaptation and a social influence. Water Science and Technology, 63(12), 2796-2801.
- ↑ Bentley StormCAD CONNECT Edition Help. N.D. I-D-F Curves.
- ↑ 15.0 15.1 Environment and Climate Change Canada (ECCC). 2025. IDF Data and Climate Change. https://climatedata.ca/resource/idf-data-and-climate-change/
- ↑ Martel, J.-L., Brissette, F. P., Lucas-Picher, P., Troin, M., & Arsenault, R. 2021. Climate change and rainfall intensity–duration–frequency curves: Overview of science and guidelines for adaptation. Journal of Hydrologic Engineering, 26(10), 03121001. https://doi.org/10.1061/(ASCE)HE.1943-5584.0002122
- ↑ USDA. 2021. Estimating Runoff Volume and Peak Discharge. https://directives.nrcs.usda.gov/sites/default/files2/1712930818/31754.pdf
- ↑ City of Toronto. 2006. Wet Weather Flow Management. https://www.toronto.ca/wp-content/uploads/2017/11/9191-wwfm-guidelines-2006-AODA.pdf
- ↑ CSA, 2025. CSA 231:25 Developing and interpreting intensity-duration-frequency (IDF) information under a changing climate. https://www.csagroup.org/store/product/2431590/?srsltid=AfmBOopkRT3cosyCstZMacCmlthJxgfo6w6aFIXyuEExGmyBT8zw1vMs
- ↑ City of Clearwater. 2025. Help Keep Clearwater's Stormwater Clean. https://www.myclearwater.com/My-Government/0-City-Departments/Public-Works/Help-Keep-Clearwaters-Stormwater-Clean
- ↑ 21.0 21.1 STEP. 2015. Hydrologic Assessment of LID Honda Campus, Markham, ON. https://sustainabletechnologies.ca/app/uploads/2015/07/Honda_TechBrief_July2015.pdf
- ↑ 22.0 22.1 STEP. 2020. Wychwood Subdivision, City of Brampton Low Impact Development Infrastructure Performance and Risk Assessment. https://sustainabletechnologies.ca/app/uploads/2020/06/Wychwood-Report.pdf
- ↑ City of Vaughn. 2024. Costco wholesale corporation zoning by-law amendment. https://pub-vaughan.escribemeetings.com/filestream.ashx?DocumentId=166701