Changes

Jump to navigation Jump to search
Line 32: Line 32:     
'''Histogram of rainfall during a typical storm event overlaid with hydrographs showing:'''
 
'''Histogram of rainfall during a typical storm event overlaid with hydrographs showing:'''
<br />• pre-development (blue) peak discharge is low and creates the least amount of runoff
+
*pre-development (blue) peak discharge is low and creates the least amount of runoff
<br />• post-development without SWM facilities (red) discharge responds quickly to rainfall and has high peak flow
+
*post-development without SWM facilities (red) discharge responds quickly to rainfall and has high peak flow
<br />• post-development with an end-of-pipe SWM pond (green) discharge reaches the same peak flow as pre-development conditions but produces more runoff.
+
*post-development with an end-of-pipe SWM pond (green) discharge reaches the same peak flow as pre-development conditions but produces more runoff.
    
The checkered yellow space between the blue and green lines shows the difference between the runoff volumes - this area is where LID can be used to reduce runoff by storing and infiltrating rainfall. Image credit: Daniel Filippi.
 
The checkered yellow space between the blue and green lines shows the difference between the runoff volumes - this area is where LID can be used to reduce runoff by storing and infiltrating rainfall. Image credit: Daniel Filippi.

Navigation menu