Difference between revisions of "CLI-ECA"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 63: Line 63:
 
== Municipal examples (instead of external links)==
 
== Municipal examples (instead of external links)==
 
===Annual Reports===
 
===Annual Reports===
Municipalities in Ontario are required by the Ministry of the Environment, Conservation and Parks (MECP) to submit annual Stormwater Performance Reports, which must be made available to the public at no charge. Below are examples of reports published by the City of Mississauga,  
+
Municipalities in Ontario are required by the Ministry of the Environment, Conservation and Parks (MECP) to submit annual Stormwater Performance Reports, which must be made available to the public at no charge. Below are examples of these reports, including the City of Mississauga, Town of Newmarket wastewater and stormwater reports, and
 
<pdf width="900" height="800">File:2024-Annual-Performance-Report-Mississauga-stormwater-system.pdf</pdf>
 
<pdf width="900" height="800">File:2024-Annual-Performance-Report-Mississauga-stormwater-system.pdf</pdf>
 +
<pdf width="900" height="800">File:TON 2024 Annual Wastewater Collection System Performance Report.pdf</pdf>
 +
<pdf width="900" height="800">File:2024 Stormwater Management Annual Performance Report Newmarket.pdf</pdf>

Revision as of 19:03, 10 September 2025

TrilliumMECP.jpeg

The Municipal Consolidated Linear Infrastructure Environmental Compliance Approval (CLI-ECA) is a streamlined approval process for municipalities managing stormwater and Low Impact Development (LID) infrastructure. This guide offers step-by-step instructions to ensure compliance with CLI-ECA requirements.

Step-by-Step Compliance Process[edit]

Step 1: Determine if Your Project Falls Under CLI-ECA[edit]

Identify whether the proposed stormwater or LID project qualifies as a pre-authorized alteration under CLI-ECA. Common eligible projects include:

Step 2: Review Design Criteria and Standards[edit]

Step 3: Complete Required Documentation[edit]

Use the appropriate compliance forms based on project type:

Form SW1 – Storm Sewers/Ditches/Culverts​ Form SW2 – Stormwater Management Facilities Form SW3 – Third Pipe Collection Systems

Prepare a Design Report including:

Step 4: Obtain Engineering and Owner Verification[edit]

A Licensed Engineering Practitioner must verify that:

  • The design aligns with CLI-ECA criteria.
  • The system is designed for proper stormwater management without negative impacts.

The Municipal Owner must sign off on compliance forms confirming:

  • The alteration does not result in adverse effects.
  • It aligns with jurisdictional stormwater management objectives.

Step 5: Submit a Director Notification (If Required)[edit]

Some alterations require notification to the MECP Director within specific timeframes:

  • 30 days after placing new works into service.
  • 90 days if previously undocumented infrastructure is discovered.

The notification must include:

  • Project description
  • Verification documents
  • Compliance assessment

Step 6: Conduct Post-Construction Inspection and Verification[edit]

  • Inspect LID and stormwater systems to ensure they function as designed.
  • Complete "Post-Construction Verification" on relevant forms.
  • Document key performance indicators such as infiltration rates, flow control effectiveness, and pollutant removal efficiency.

Step 7: Maintain Ongoing Compliance and Record-Keeping[edit]

Establish a Stormwater System Maintenance Plan that includes:

  • Routine inspections (e.g., sediment removal, vegetation management)
  • Adaptive management strategies for system improvements

Retain compliance records for a minimum of 10 years. Submit annual performance reports if required by municipal or provincial regulations.

External links[edit]

Municipal examples (instead of external links)[edit]

Annual Reports[edit]

Municipalities in Ontario are required by the Ministry of the Environment, Conservation and Parks (MECP) to submit annual Stormwater Performance Reports, which must be made available to the public at no charge. Below are examples of these reports, including the City of Mississauga, Town of Newmarket wastewater and stormwater reports, and load PDF load PDF load PDF