Changes

Jump to navigation Jump to search
Line 207: Line 207:  
{{Clickable button|[[File:IMAX location.PNG|150 px|link=https://sustainabletechnologies.ca/app/uploads/2022/03/rpt_IMAXreport_f_20220222.pdf]]}}
 
{{Clickable button|[[File:IMAX location.PNG|150 px|link=https://sustainabletechnologies.ca/app/uploads/2022/03/rpt_IMAXreport_f_20220222.pdf]]}}
   −
This report, released by CVC this year (2022) provides a thorough overview of the monitoring work done at the Imax Corporate Headquarters, located in Mississauga, ON. The parking lot was expanded and retrofitted with a combination of traditional asphalt and [[Permeable pavement]]. The asphalt runoff drains to one of three vegetated [[Bioretention]] units on site. The parking lot runoff is collected, absorbed and filtered by these LID practices before entering a [[Wetland]] adjacent to the parking lot. Read more about these features performance over this multi-year study by clicking the button above.
+
This report, released by CVC in 2022 provides a thorough overview of the monitoring work done at the Imax Corporate Headquarters, located in Mississauga, ON. The parking lot was expanded and retrofitted with a combination of traditional asphalt and [[Permeable pavement]]. The asphalt runoff drains to one of three vegetated [[Bioretention]] units on site. The parking lot runoff is collected, absorbed and filtered by these LID practices before entering a [[Wetland]] adjacent to the parking lot. Read more about these features performance over this multi-year study by clicking the button above.
    
{{Clickable button|[[File:UOIT lid.PNG|130 px|link=https://sustainabletechnologies.ca/app/uploads/2017/08/UOIT-Case-Study_2017.pdf]]}}
 
{{Clickable button|[[File:UOIT lid.PNG|130 px|link=https://sustainabletechnologies.ca/app/uploads/2017/08/UOIT-Case-Study_2017.pdf]]}}

Navigation menu