Changes

Jump to navigation Jump to search
Line 96: Line 96:     
===Construction Inspection===
 
===Construction Inspection===
The following items should be inspected prior to final sign-off on the stormwater management construction:
+
The following items should be inspected prior to final sign-off on the stormwater management construction:<br>
Catchment area matches original design plans;
+
* Catchment area matches original design plans;
[[Overflow|Overflow system]] is properly sized and installed;
+
* [[Overflow|Overflow system]] is properly sized and installed;
[[Pretreatment]] system is installed;
+
* [[Pretreatment]] system is installed;
Screens are installed on all openings;
+
* Screens are installed on all openings;
Cistern foundation is constructed as shown on original design plans; and
+
* Cistern foundation is constructed as shown on original design plans; and
Catchment area and overflow area are properly stabilized.  
+
* Catchment area and overflow area are properly stabilized.
    
==Performance==
 
==Performance==

Navigation menu