===Construction Inspection===
===Construction Inspection===
−
The following items should be inspected prior to final sign-off on the stormwater management construction:
+
The following items should be inspected prior to final sign-off on the stormwater management construction:
<br>
−
•
Catchment area matches original design plans;
+
*
Catchment area matches original design plans;
−
•
[[Overflow|Overflow system]] is properly sized and installed;
+
*
[[Overflow|Overflow system]] is properly sized and installed;
−
•
[[Pretreatment]] system is installed;
+
*
[[Pretreatment]] system is installed;
−
•
Screens are installed on all openings;
+
*
Screens are installed on all openings;
−
•
Cistern foundation is constructed as shown on original design plans; and
+
*
Cistern foundation is constructed as shown on original design plans; and
−
•
Catchment area and overflow area are properly stabilized.
+
*
Catchment area and overflow area are properly stabilized.
==Performance==
==Performance==
DanielFilippi
Bots
,
Bureaucrats
, developer,
Interface administrators
,
Suppressors
,
Administrators
,
Widget editors
2,253
edits
Navigation menu
Personal tools
Log in
Namespaces
Page
Discussion
Variants
Views
Read
View source
View history
More
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version