Line 1:
Line 1:
−
[[File:TrilliumMECP.jpeg|thumb]]
+
[[File:TrilliumMECP.jpeg|right|frameless]]
The Municipal Consolidated Linear Infrastructure Environmental Compliance Approval (CLI-ECA) is a streamlined approval process for municipalities managing stormwater and Low Impact Development (LID) infrastructure. This guide offers step-by-step instructions to ensure compliance with CLI-ECA requirements.
The Municipal Consolidated Linear Infrastructure Environmental Compliance Approval (CLI-ECA) is a streamlined approval process for municipalities managing stormwater and Low Impact Development (LID) infrastructure. This guide offers step-by-step instructions to ensure compliance with CLI-ECA requirements.
Line 18:
Line 18:
{{clickable button|[[Media:Form_SW1_-_STM_-_May25-2022.pdf|Form SW1 – Storm Sewers/Ditches/Culverts]]}}
{{clickable button|[[Media:Form_SW1_-_STM_-_May25-2022.pdf|Form SW1 – Storm Sewers/Ditches/Culverts]]}}
−
+
{{clickable button|[[Media:Form_SW2_-_STM_-_May25-2022.pdf|Form SW2 – Stormwater Management Facilities]]}}
−
{{cliackable button|[[Media:Form_SW2_-_STM_-_May25-2022.pdf|Form SW2 – Stormwater Management Facilities]]}}
+
{{clickable button|[[Media:Form SW3 - STM - May25-2022.pdf|Form SW3 – Third Pipe Collection Systems]]}}
−
−
{{cliackable button|[[Media:Form SW3 - STM - May25-2022.pdf|Form SW3 – Third Pipe Collection Systems]]}}
Prepare a Design Report including:
Prepare a Design Report including:
Line 55:
Line 53:
* Routine inspections (e.g., [[sediment]] removal, [[vegetation]] management)
* Routine inspections (e.g., [[sediment]] removal, [[vegetation]] management)
* Adaptive management strategies for system improvements
* Adaptive management strategies for system improvements
−
Retain compliance records for a minimum of **10 years**.
+
Retain compliance records for a minimum of 10 years.
Submit annual performance reports if required by municipal or provincial regulations.
Submit annual performance reports if required by municipal or provincial regulations.