<p>The ratio of impervious drainage area to infiltration area should be between 5:1 and 20:1 to limit the rate of accumulation of fine sediments and clogging.</p> | <p>The ratio of impervious drainage area to infiltration area should be between 5:1 and 20:1 to limit the rate of accumulation of fine sediments and clogging.</p> |