Changes

Jump to navigation Jump to search
no edit summary
Line 11: Line 11:  
===Step 2: Review Design Criteria and Standards===
 
===Step 2: Review Design Criteria and Standards===
 
* Ensure project design follows **MECP’s Design Criteria for Sanitary Sewers, Storm Sewers, and Forcemains**.
 
* Ensure project design follows **MECP’s Design Criteria for Sanitary Sewers, Storm Sewers, and Forcemains**.
* Incorporate stormwater treatment objectives from the **Stormwater Management Planning and Design Guidance Manual (2003)**.
+
* Incorporate stormwater treatment objectives from the [https://www.ontario.ca/document/stormwater-management-planning-and-design-manual-0 Stormwater Management Planning and Design Guidance Manual (2003)].
 
* Ensure LID features meet municipal and provincial standards for [[infiltration]], [[flow control]], and [[water quality]] treatment.
 
* Ensure LID features meet municipal and provincial standards for [[infiltration]], [[flow control]], and [[water quality]] treatment.
  

Navigation menu