The Central Parkway low impact development (LID) road retrofit is located on Central Parkway East, just south of Burnhamthorpe Road in Mississauga, Ontario. Read the brief authored by CVC about the performance of the [[Stormwater Tree Trenches]] LID feature is able to reduce the majority of stormwater runoff leaving the site during most rainfall events. The Central Parkway project was the first green road retrofit to take place in Mississauga where the Silva Cell system [[Soil cells]] were specifically used for stormwater treatment in addition to encouraging tree growth and aesthetic design. | The Central Parkway low impact development (LID) road retrofit is located on Central Parkway East, just south of Burnhamthorpe Road in Mississauga, Ontario. Read the brief authored by CVC about the performance of the [[Stormwater Tree Trenches]] LID feature is able to reduce the majority of stormwater runoff leaving the site during most rainfall events. The Central Parkway project was the first green road retrofit to take place in Mississauga where the Silva Cell system [[Soil cells]] were specifically used for stormwater treatment in addition to encouraging tree growth and aesthetic design. |