Line 113:
Line 113:
==Life Cycle Costs==
==Life Cycle Costs==
−
To learn about Life Cycle Costs associated with this practice (i.e. Pre-construction, Excavation, Materials & Installation, Project Management, Overhead, Inspection and Maintenance, Rehabilitation and other associated costs), visit the [[Rainwater Harvesting & Cisterns: Life Cycle Costs]] page to view a cost estimate for a 50,000 L, below-ground concrete cistern and learn more about planning your own LID-based project budget with the [https://sustainabletechnologies.ca/lid-lcct/ STEP's Low Impact Development Life Cycle Costing Tool (LID LCCT)].
+
To learn about Life Cycle Costs associated with this practice (i.e. Pre-construction, Excavation, Materials & Installation, Project Management, Overhead, Inspection and Maintenance, Rehabilitation and other associated costs), visit the [[Rainwater Harvesting & Cisterns: Life Cycle Costs]] page to view a cost estimate for a 50,000 L, below-ground concrete cistern. Alternatively you can use the [https://sustainabletechnologies.ca/lid-lcct/ STEP's Low Impact Development Life Cycle Costing Tool (LID LCCT)] to generate cost estimates customized to your own LID stormwater design project specifications.
Take a look at the [[Rainwater Harvesting & Cisterns: Life Cycle Costs]] page by clicking below for further details:
Take a look at the [[Rainwater Harvesting & Cisterns: Life Cycle Costs]] page by clicking below for further details:
Line 155:
Line 155:
*[https://www.makeway.ca/products/rainwater-harvesting-systems/ Make-Way Environmental Technologies Inc.]
*[https://www.makeway.ca/products/rainwater-harvesting-systems/ Make-Way Environmental Technologies Inc.]
*[https://www.premiertechaqua.com/en-ca/water-management/rainwater-harvester PremierTech REWATEC]
*[https://www.premiertechaqua.com/en-ca/water-management/rainwater-harvester PremierTech REWATEC]
+
*[https://www.raingrid.com/ RainGrid]
*[http://rh2o.com/company RH<sub>2</sub>O]
*[http://rh2o.com/company RH<sub>2</sub>O]
==References==
==References==