Difference between revisions of "Enhanced swales"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
 
(59 intermediate revisions by 2 users not shown)
Line 1: Line 1:
[[File:Dry enhanced swale.png|thumb|Skeleton schematic illustrating the installation of [[check dams]] with centralized, flow concentrating cutouts]]
+
<imagemap>
[[File:Wet swale.png|thumb|The check dams are spaced slightly further apart than would be recommended to maximize infiltration capacity i.e. ponding isn't quite continuous between the dams.]]
+
 
 +
File:Dry enhanced swale w-road.png|600px|thumb|Skeleton schematic illustrating the installation of [[check dams]] with centralized, flow concentrating cutouts. Street runoff would enter the swale through sheet flow or curb cuts and flow across the filter strip on the left side of the image.<span style="color:red">''A note: The following is an "image map", feel free to explore the image with your cursor and click on highlighted labels that appear to take you to corresponding pages on the Wiki.''</span>
 +
 
 +
rect 322 1590 232 1535 [[Curb cuts|Curb Cut]]
 +
rect 1121 966 1211 1028 [[Curb cuts|Curb Cut]]
 +
rect 1768 561 1850 612 [[Curb cuts|Curb Cut]]
 +
poly 29 1746 21 2358 2505 522 2143 401 [[Turf|Salt Tolerant Grass Mix]]
 +
poly 2084 811 2076 916 2603 1064 2614 967 2614 943 [[Check dams|Check Dams]]
 +
poly 1538 1232 1534 1364 2111 1575 2147 1438 [[Check dams|Check Dams]]
 +
poly 731 1945 770 1801 1429 2144 1445 2327 809 1992 [[Check dams|Check Dams]]
 +
poly 961 2459 2837 604 3102 651 1429 2463 [[Berms|Berms]]
 +
poly 18 2432 938 2467 2747 694 2466 600 [[Grasses|Grasses]]
 +
poly 18 1742 18 2440 1920 1029 2513 530 2131 386 [[Turf|Salt Tolerant Grass Mix]]
 +
</imagemap>
 +
{{TOClimit|2}}
 +
 
 +
 
 +
[[File:Wet swale.png|600px|thumb|The check dams are spaced slightly further apart than would be recommended to maximize infiltration capacity i.e. ponding isn't quite continuous between the dams.]]
 +
 
 
This article is about installations designed to capture and convey surface runoff along a vegetated channel, whilst also promoting infiltration. <br>
 
This article is about installations designed to capture and convey surface runoff along a vegetated channel, whilst also promoting infiltration. <br>
For underground conveyance which promotes infiltration, see [[Exfiltration trenches]].<br>
+
*For underground conveyance which promotes infiltration, see [[Exfiltration trenches]].<br>
For conveyance along planted channels, on both surface and underground, see [[Bioswales]].
+
*For conveyance along planted channels, on both surface and underground, see [[Bioswales]].
{{TOClimit|2}}
+
 
 
==Overview==
 
==Overview==
 +
 +
Enhanced Grass Swales are vegetated open channels designed to convey, treat and attenuate stormwater runoff. Simple grass channels or ditches have long been used for stormwater conveyance, particularly for road drainage. Enhanced grass swales incorporate design features such as modified geometry and check dams that improve the contaminant removal and runoff reduction functions of simple grass channel and roadside ditch designs. Bioretention swales (i.e.bioswales, dry swales) incorporate filter media and possibly a perforated pipe underdrain to ensure they drain within the required drawdown time. Where development density, topography and depth to water table permit, swales are a preferable alternative to curb and gutter and storm drains as a stormwater conveyance system.<br>
 
{{textbox|Enhanced swales are an ideal technology for:  
 
{{textbox|Enhanced swales are an ideal technology for:  
 
*Sloped sites,  
 
*Sloped sites,  
 
*Cheaply retrofitting and improving the performance of existing grass swales.}}
 
*Cheaply retrofitting and improving the performance of existing grass swales.}}
 +
 +
Take a look at the downloadable Enhanced Grass Swales Factsheet below for a .pdf overview of this LID Best Management Practice:
 +
 +
{{Clickable button|[[File:Enhanced swale.png|150 px|link=https://wiki.sustainabletechnologies.ca/images/8/85/Swales_final_Update.pdf]]}}
 +
 +
 
'''The fundamental components of an enhanced grassed swale are:'''
 
'''The fundamental components of an enhanced grassed swale are:'''
 
*Graded channel
 
*Graded channel
Line 19: Line 45:
 
==Planning considerations==
 
==Planning considerations==
 
When planning a new site, all swales and overground flow paths should be fitted perpendicular to existing contours. See [[Natural drainage]] and [[Existing hydrology]].  
 
When planning a new site, all swales and overground flow paths should be fitted perpendicular to existing contours. See [[Natural drainage]] and [[Existing hydrology]].  
 +
 +
===Infiltration===
 +
Enhanced swales include check dams that can be designed to pond substantial volumes of water on the swale surface between flow events, so provide both stormwater conveyance and infiltration functions. 
 +
For information about constraints to infiltration practices, and approaches and tools for identifying and designing within them see [[Infiltration]].
  
 
===Best cross sections===
 
===Best cross sections===
Line 27: Line 57:
  
 
===Safety===
 
===Safety===
As shallow grassed swales are a common roadside construction, the Ministry of Transport has created their own guide to maximum flow depth and freeboard<ref>Ontario Ministry of Transportation, & Ontario Ministry for Transportation. (2016). Stormwater Management Requirements for Land Development Proposals. Retrieved February 26, 2018, from http://www.mto.gov.on.ca/english/publications/drainage/stormwater/section8.shtml#controls</ref><ref>Drainage and Hydrology Section Transportation Engienering Branch Quality and Standards Division. (1997). MTO Drainage Management Manual. Retrieved from http://www.ontla.on.ca/library/repository/mon/12000/198363.pdf</ref>. Their advice has been prepared specifically for high risk environments and those stringent constraints should not be applied to all circumstances. In many urban environments the principle of applying check dams to enhance all surface BMPS can be safely used to encourage ponding and subsequent [[infiltration]] for a day or two.
+
As shallow grassed swales are a common roadside construction, the Ministry of Transport has created their own guide to maximum flow depth and freeboard<ref>Ontario Ministry of Transportation, & Ontario Ministry for Transportation. (2016). Stormwater Management Requirements for Land Development Proposals. Retrieved February 26, 2018, from http://www.mto.gov.on.ca/english/publications/drainage/stormwater/section8.shtml#controls</ref><ref>Drainage and Hydrology Section Transportation Engienering Branch Quality and Standards Division. (1997). MTO Drainage Management Manual. Retrieved from http://www.ontla.on.ca/library/repository/mon/12000/198363.pdf</ref>. Their advice has been prepared specifically for high risk environments and those stringent constraints should not be applied to all circumstances. In many urban environments the principle of applying check dams to enhance all surface BMPs can be safely used to encourage ponding and subsequent [[infiltration]] for a day or two.
 +
 
 +
===Native Soil===
 +
Swales can be located over any soil type, but HSG A and B soils are best for achieving water balance objectives. Facilities should be located in portions of the site with the highest native soil infiltration rates. Where infiltration rates are less than 15 mm/hr (hydraulic conductivity less than 1x10-6 cm/s) an underdrain is recommended. Native soil infiltration rate at the proposed facility location and depth should be confirmed through in-situ measurements of hydraulic conductivity under field saturated conditions.
 +
 
 +
===Wellhead Protection===
 +
Facilities receiving road or parking lot runoff should not be located within year 2 year time-of-travel wellhead protection areas (see local drinking water source protection plan).
 +
 
 +
===Available Space===
 +
Reserve open space of about 5 to 20% of the size of the contributing drainage area. A width of at least 2 metres is needed
 +
 
 +
===Site Topography===
 +
Contributing slopes should be between 1 to 5%. Swale longitudinal slopes may range from 0.5 to 6% (this prevents ponding while providing residence time and preventing erosion). On slopes steeper than 3%, check dams should be used. Check the [https://sustainabletechnologies.ca/home/erosion-and-sediment-control/esc-guide/ Erosion and Sediment Control Guide]
 +
 
 +
===Water Table===
 +
Maintaining a separation of 1 m between the elevations of the base of the practice and the seasonally high water table, or top of bedrock is recommended. Lesser or greater values may be considered based on groundwater mounding analysis. See STEP LID Planning and Design Guide wiki page, [[Groundwater]], for further guidance and spreadsheet tool.
 +
 
 +
===Pollution Hot Spot Runoff===
 +
To protect groundwater from possible contamination, runoff from pollution hot spots (i.e. (e.g., vehicle fueling, servicing and demolition areas, outdoor storage and handling areas for hazardous materials and some heavy
 +
industry sites) should not be treated by swales designed for infiltration. Facilities designed with an impermeable liner (filtration only) can be used to treat runoff from hot spots.
 +
 
 +
===Proximity to Underground Utilities===
 +
Designers should consult local utility design guidance for the horizontal and vertical clearance between storm drains, ditches and surface water bodies. Utilities running parallel to the grass swale should be offset from the centerline of the swale. Generally, underground utilities below the bottom of the swale are not a problem.
 +
 
 +
===Karst===
 +
Swales designed for infiltration are not suitable in areas of known or implied karst topography.
 +
 
 +
===Setback from Buildings===
 +
Should be set back a minimum of 4m from building foundations.
 +
 
 +
 
 +
For a table summarizing information on planning considerations and site constraints see [[Site considerations]].
  
 
==Design==
 
==Design==
 +
 +
See: [[Enhanced swales: Specifications]] for further guidance regarding BMP sizing.
 +
 
All swales should be designed to meet the following criteria:
 
All swales should be designed to meet the following criteria:
 +
*Treat drainage areas of <u><</u>2 hectares
 
*Minimum residence time of 5 minutes.  
 
*Minimum residence time of 5 minutes.  
 
*Maximum flow velocity 0.3 m/s
 
*Maximum flow velocity 0.3 m/s
*Bottom width between 0.6 - 2.4 m
+
*Bottom width between 0.75 - 3.0 m
 
*Minimum length 30 m
 
*Minimum length 30 m
*Maximum depth of flow should be 50% height of grass for regularly mown swales, to maximum of 75 mm, or 33% height of vegetation for infrequently mown swales.  
+
*Minimum length between checkdams <u>></u> 5m
 +
*Maximum depth of flow should be 50% height of grass for regularly mown swales, to a maximum of 100 mm, or 33% height of vegetation for infrequently mown swales
 +
*Cross-section shape may be parabolic or trapezoidal, but parabolic is preferable for aesthetics, maintenance and hydraulics.
 +
 
 +
[[File:GrassSwale.bmp parabolic.png|thumb|500px|Cross-section view of a parabolic designed swale. Source: Horry County, Southern California.<ref>Horry County Government. 2022. Stormwater Engineers - Plans and the Construction Process. https://www.horrycounty.org/Departments/Stormwater/engineers</ref>.]]
 +
 
 +
===Geometry and Site Layout===
 +
Minimum planting soil or filter media bed footprint area is based on the design storm runoff volume and effective surface ponding depth behind check dams. Recommended impervious drainage area to pervious facility footprint area ratios (I:P ratios) range from:
 +
 
 +
*5:1 on low permeability soils, such as [[Soil groups|hydrologic soil group (HSG) C and D]],
 +
*20:1 on high permeability soils [[Soil groups|hydrologic soil group (HSG) Aand D]].
 +
 
 +
For sizing of grass swales, see the following suggested equations to calculate their capacity / retention: [[Retention swales]]
 +
 
 +
===Pre-Treatment===
 +
Pre-treatment captures sediment before it reaches the filter bed. It is typically necessary unless runoff sediment load is very low (e.g. roof drainage). Pre-treatment options include:
 +
*level spreaders
 +
*stone filter inlets with geotextile fabric and,
 +
catch basins with sump.
 +
 
 +
===Planting Soil & Filter Media===
 +
Planting soil or filter media should come pre-mixed from an approved vendor.
 +
 
 +
===Underdrains===
 +
[[Underdrains]] are recommended for bioswales where native soil infiltration rate <15 mm/h (hydraulic conductivity < 1x10<sup>-6</sup> cm/s), and needed for non-infiltrating designs. They are comprised of a length of perforated pipe embedded near the top of the storage reservoir, with an overlying choker layer of medium-sized aggregate, and structures to provide inspection and maintenance access. Alternatively, the perforated pipe could be installed on the reservoir bottom and connected to an upturned pipe assembly or riser. Another option is to include a flow restrictor (e.g. orifice cap or valve) on the underdrain outlet pipe, to optimize infiltration while meeting the required drainage time.
 +
 
 +
===Perforated Pipe===
 +
Continuously perforated pipe should be either smooth interior HDPE or PVC pipe with diameter ≥200 mm to reduce freezing risk and facilitate access by camera and cleaning equipment. Perforated pipe extends length of facility and solid pipe is used to connect to storm drain system.
 +
 
 +
===Access Structures===
 +
The use of maintenance holes/vertical standpipes connected to the perforated pipe system are used for inspection and flushing, ensure couplings used for standpipe connections are 45° to facilitate pipe access by camera or cleaning equipment. (See to the right for example of couplings attaching to an underdrain pipe.
 +
 
 +
[[File:45 degs.PNG|thumb|400px]]
 +
 
 +
===Conveyance and Overflow===
 +
Swales can be designed to be inline or offline from the drainage system. Inline swales accepts all flow from the drainage area and conveys large event flows through an overflow outlet. Overflow structures must be sized to safely convey large event flows out of the facility. Options include flat, dome or ditch inlet catch basins connected to a storm sewer.
  
 +
See: [[Overflow: Gallery]] for examples.
 +
 +
===Monitoring Wells===
 +
A vertical standpipe consisting of an anchored 100 to 150 mm diameter pipe with perforations along the length within the reservoir, installed to the bottom of the facility, with a lockable cap. The well allows monitoring of inter-event drainage times with the use of a water level data logger sampler.
  
 
===Planting Considerations===
 
===Planting Considerations===
*[[Grasses]] and herbaceous species with dense root structure cover should be favoured along the bottom of the swale for their ability to increase infiltration, stabilize soils, retain pollutants and assist with suspended solids.  
+
*[[Grasses]] and herbaceous species with dense root structure cover should be favoured along the bottom of the swale for their ability to increase infiltration, stabilize soils, retain pollutants and assist with suspended solids.
 +
*Enhanced grass swales may be planted with sod or seed. Stabilize swale with erosion control blanket if planting with seed. Include a temporary cover crop in native seed mix.
 
*The plant material on the slopes of grass channels must be capable of withstanding periodic inundation in addition to extended periods of drought. Species include grasses and groundcovers, as well as low shrub species.  
 
*The plant material on the slopes of grass channels must be capable of withstanding periodic inundation in addition to extended periods of drought. Species include grasses and groundcovers, as well as low shrub species.  
 
*Plants along the exterior of this zone act to slow the flow during stormwater events, reducing sedimentation and increasing infiltration.  The root structure of this plant material also acts to reduce erosion.
 
*Plants along the exterior of this zone act to slow the flow during stormwater events, reducing sedimentation and increasing infiltration.  The root structure of this plant material also acts to reduce erosion.
Line 48: Line 153:
 
*Erosion protection such as river stone or riprap will be required to dissipate the energy from incoming concentrated flow.  
 
*Erosion protection such as river stone or riprap will be required to dissipate the energy from incoming concentrated flow.  
 
*The channel must be vegetated immediately after [[grading]]. Preferably, the swale should be planted in the spring so that the vegetation can become established with minimal irrigation.
 
*The channel must be vegetated immediately after [[grading]]. Preferably, the swale should be planted in the spring so that the vegetation can become established with minimal irrigation.
 +
 +
==Inspection and Maintenance==
 +
Maintenance requirements for [[enhanced swales|enhanced grass swales]], and swales is similar to vegetated filter strips and typically involve a low level of activity after [[vegetation]] becomes established. [[Grass]] channel maintenance procedures are already in place at many municipal public works and transportation departments. These procedures should be compared to the recommendations provided on the [[Inspection and Maintenance: Enhanced Swales]] page to assure that the infiltration and water quality
 +
benefits of enhanced grass swales are preserved.
 +
 +
Routine roadside ditch maintenance practices such as scraping and re-grading should be avoided at swale locations. Vehicles should not be parked or driven on grass swales. For routine mowing, the lightest possible mowing equipment should be used to prevent soil compaction.
 +
 +
For swales located on private property, the property owner, resident or manager is responsible for maintenance as outlined in a legally binding maintenance agreement. Roadside
 +
swales in residential areas generally receive routine maintenance from homeowners who should be advised regarding recommended maintenance activities and ensure they do not build anything within or on the channel of the swale which could result in flooding or pooling on theirs or their neighbours' properties.
 +
 +
<br>
 +
Take a look at the [[Inspection and Maintenance: Enhanced Swales]] page by clicking below for further details about proper inspection and maintenance practices:
 +
 +
{{Clickable button|[[File:Cover Photo swales.PNG|150 px|link=https://wiki.sustainabletechnologies.ca/index.php title=Inspection_and_Maintenance:_Enhanced_Swales&action=edit]]}}
 +
 +
==Construction Considerations==
 +
Properly installed enhanced swales should abide by the following recommendations:
 +
* Grass swales should be clearly marked before site work begins to avoid disturbance during construction.
 +
* No vehicular traffic, except that specifically used to construct the facility, should be allowed within the swale site.
 +
* Any accumulation of sediment that does occur within the swale must be removed during the final stages of grading to achieve the design cross section, see above, under the [[Design]] section.
 +
* Final grading and planting should not occur until the adjoining areas draining into the swale are stabilized. Flow should also not be diverted into the swale until the banks are stabilized.
 +
* Preferably, the swale should be planted in the spring so that the vegetation can become established with minimal irrigation.
 +
* Installation of erosion control matting or blanketing to stabilize soil during establishment of vegetation is highly recommended.
 +
* If sod is used, it should be placed with staggered ends and secured by rolling the sod. This helps to prevent gullies
  
 
==Modeling==
 
==Modeling==
Line 55: Line 184:
 
{{:Turf}}
 
{{:Turf}}
 
{{:Stone}}
 
{{:Stone}}
[[check dams]]
+
===Check dams===
 +
{{:Check dams}}
 +
 
 +
==Performance==
 +
{|class="wikitable"
 +
|+Ability of Swales to Meet Stormwater Management Objectives
 +
|-
 +
!BMP
 +
!Water Balance
 +
!Water Quality
 +
!Erosion Control
 +
|-
 +
|'''Swale with no underdrain'''
 +
|Partial-based on available storage volume and native soil infiltration rate
 +
|Yes-size for water quality storage requirement and maximum flow rate 0.5 m/s
 +
|Partial-based on available storage volume and native soil infiltration rate
 +
|-
 +
|'''Swale with underdrain or partial infiltration'''
 +
|Partial-based on available storage volume beneath the underdrain and soil infiltration rate
 +
|Yes-size for water quality storage requirement
 +
|Partial-based on available storage, native soil infiltration rate and if a flow restrictor is used
 +
|-
 +
|'''Swale with underdrain and impermeable liner or no infiltration'''
 +
|Partial-some volume reduction through evapo-transpiration
 +
|Yes-size for water quality storage requirement
 +
|Partial-based on available storage volume and if a flow restrictor is used
 +
|}
 +
 
 +
===Water Balance===
 +
Recent research indicates that a conservative runoff reduction rate of 10 to 20% can be used depending on whether soils fall in [[Soil groups| hydrologic soil groups A/B or C/D,]] respectively. The runoff reduction rates can be doubled if the native soils on which the swale is located have been tilled to a depth of 300 mm and amended with compost to achieve an organic content of between 8 and 15% by weight or 30 to 40% by volume. The main contributing factors that influence runoff reduction rates for swales are: 
 +
* Native [[Soil groups|soil]] types
 +
* [[Grading|Slope]]
 +
* [[Vegetation|Vegetative cover]] and,
 +
* [[Enhanced swales: Specifications|Length of the swale.]]
 +
 
 +
{|class="wikitable"
 +
|+Volumetric runoff reduction from enhanced swales
 +
|-
 +
!'''LID Practice'''
 +
!'''Location'''
 +
!'''<u><span title="Note: Runoff reduction estimates are based on differences between runoff volume from the practice and total precipitation over the period of monitoring unless otherwise stated." >Runoff Reduction*</span></u>'''
 +
!'''Reference'''
 +
|-
 +
|rowspan="8" style="text-align: center;" | Grass Swale
 +
|style="text-align: center;" |Brampton
 +
|style="text-align: center;" |15 to 35%,
 +
|style="text-align: center;" |[https://sustainabletechnologies.ca/app/uploads/2020/11/CC-Bioswale-Tech-brief-2018-FINAL.pdf| STEP (2018)]<ref>Sustainable Technologies Evaluation Program. Effectiveness of Retrofitted Roadside Biofilter Swales - County Court Boulevard, Brampton. Technical Brief. https://sustainabletechnologies.ca/app/uploads/2020/11/CC-Bioswale-Tech-brief-2018-FINAL.pdf. https://sustainabletechnologies.ca/app/uploads/2020/11/CC-Bioswale-Tech-brief-2018-FINAL.pdf</ref>
 +
|-
 +
|style="text-align: center;" |Sweden
 +
|style="text-align: center;" |40 to 55%,
 +
|style="text-align: center;" |Rujner ''et al''. (2016)<ref>Rujner, H., Leonhardt, G., Perttu, A.M., Marsalek, J. and Viklander, M. 2016. Advancing green infrastructure design: Field evaluation of grassed urban drainage swales. Modélisation/Models-Contrôle à la source/Source control. http://documents.irevues.inist.fr/bitstream/handle/2042/60477/3B7P03-124RUJ.pdf</ref>
 +
|-
 +
|style="text-align: center;" |Seoul, Korea
 +
|style="text-align: center;" |40 to 75%,
 +
|style="text-align: center;" |Rujner ''et al''. (2016)<ref>Rujner, H., Leonhardt, G., Perttu, A.M., Marsalek, J. and Viklander, M. 2016. Advancing green infrastructure design: Field evaluation of grassed urban drainage swales. Modélisation/Models-Contrôle à la source/Source control. http://documents.irevues.inist.fr/bitstream/handle/2042/60477/3B7P03-124RUJ.pdf</ref>
 +
|-
 +
|style="text-align: center;" |Maryland
 +
|style="text-align: center;" |59%
 +
|style="text-align: center;" |Davis ''et al''. (2012)<ref>Davis, A.P., Stagge, J.H., Jamil, E. and Kim, H. 2012. Hydraulic performance of grass swales for managing highway runoff. Water research, 46(20), pp.6775-6786. http://www.jstagge.com/assets/papers/Hydraulic%20performance%20of%20grass%20swales%20for%20managing.pdf </ref>
 +
|-
 +
|style="text-align: center;" |Los Angeles
 +
|style="text-align: center;" |52.5%,
 +
|style="text-align: center;" |Ackerman and Stein (2008)<ref>Ackerman, D. and Stein, E.D. 2008. Evaluating the effectiveness of best management practices using dynamic modeling. Journal of Environmental Engineering, 134(8), pp.628-639. https://www.researchgate.net/profile/Eric-Stein-2/publication/228910558_Evaluating_the_Effectiveness_of_Best_Management_Practices_Using_Dynamic_Modeling/links/0912f509278915fc77000000/Evaluating-the-Effectiveness-of-Best-Management-Practices-Using-Dynamic-Modeling.pdf</ref>
 +
|-
 +
|style="text-align: center;" |Various Locations
 +
|style="text-align: center;" |40%
 +
|style="text-align: center;" |Strecker ''et al''.(2004)<ref>Strecker, E., Quigley, M., Urbonas, B., Jones, J. 2004. State-of-the-art in comprehensive approaches to stormwater. The Water Report. Issue 6. August 15,2004. </ref>
 +
|-
 +
|style="text-align: center;" |France
 +
|style="text-align: center;" |27 to 41%
 +
|style="text-align: center;" |Barrett ''et al''. (2004)<ref>Barrett, M.E. 2008. Comparison of BMP Performance Using the International BMP Database. Journal of Irrigation and Drainage Engineering. September/October. pp. 556-561 </ref>
 +
|-
 +
|style="text-align: center;" |Virginia
 +
|style="text-align: center;" |0%
 +
|style="text-align: center;" |Schueler (1983)<ref>Schueler, T. 1983. Washington Area Nationwide Urban Runoff Project. Final Report. Metropolitan Washington Council of Governments. Washington, DC. </ref>
 +
|-
 +
| colspan="2" style="text-align: center;" |'''<u><span title="Note:This estimate is provided only for the purpose of initial screening of LID practices suitable for achieving stormwater management objectives and targets. Performance of individual facilities will vary depending on site specific contexts and facility design parameters and should be estimated as part of the design process and submitted with other documentation for review by the approval authority" >Runoff Reduction Estimate*</span></u>'''
 +
|colspan="2" style="text-align: center;" |'''45% on [[Soil groups|HSG A or B soils]];'''
 +
'''10% on [[Soil groups|HSG C or D soils]]'''
 +
|-
 +
|}
 +
 
 +
===Water Quality===
 +
Research has shown the pollutant mass removal rates of grass swales are variable, depending on influent pollutant concentrations (Bäckström et al., 2006)<ref>Bäckström, M., Viklander, M. and Malmqvist, P.A. 2006. Transport of stormwater pollutants through a roadside grassed swale. Urban Water Journal, 3(2), pp.55-67. https://www.mdpi.com/2073-4441/6/7/1887/htm</ref>, but generally moderate for most pollutants (Barrett et al., 1998<ref>Barrett, M.E., Walsh, P.M. Malina Jr., J.F. and Charbeneau, R.J. 1998. Performance of Vegetative Controls for Treating Highway Runoff. Journal of Environmental Engineering. November 1998. pp. 1121-1128.</ref>; Deletic and Fletcher, 2006<ref>Deletic, A., and Fletcher, T.D. 2006. Performance of grass filters used for stormwater treatment – a field and modelling study. Journal of Hydrology. Vol. 317. pp. 261-275.</ref>). Median pollutant mass removal rates of swales from available performance studies are 76% for total suspended solids, 55% for total phosphorus, and 50% for total nitrogen (Deletic and Fletcher, 2006<ref>Deletic, A., and Fletcher, T.D. 2006. Performance of grass filters used for stormwater treatment – a field and modelling study. Journal of Hydrology. Vol. 317. pp. 261-275.</ref>). Significant reductions in total zinc and copper event mean concentrations have been observed in performance studies with a median value of 60%, but results have varied widely (Barrett, 2008<ref>Barrett, M.E. 2008. Comparison of BMP performance using the international BMP database. Journal of Irrigation and Drainage Engineering, 134(5), pp.556-561.</ref>). Site specific factors such as slope, soil type, infiltration rate, swale length and vegetative cover also affect pollutant mass removal rates. In general, the dominant pollutant removal mechanism operating in grass swales is infiltration, rather than filtration, because pollutants trapped on the surface of the swale by vegetation or check dams are not permanently bound (Bäckström et al., 2006<ref>Bäckström, M., Viklander, M. and Malmqvist, P.A. 2006. Transport of stormwater pollutants through a roadside grassed swale. Urban Water Journal, 3(2), pp.55-67. https://www.mdpi.com/2073-4441/6/7/1887/htm</ref>). In a recent international research review on processes for improving stormwwater quality treatment of grass swales and vegetated filter strips, Gavric et al. note that while understanding of hydrology and hydraulics of these stormwater control measures is adequate, there are knowledge gaps in understanding water quality treatment processes, particularly for nutrients, traffic associated organic contaminants, and bacteria (Gavric et al., 2019 <ref>Gavric.S, Leonhardt, G., Marsalek, J., Viklander, M. 2019. Processes improving urban stormwater quality in grass swales and filter strips: A review of research findings. Science of the Total Environment. v 669. pp. 431-447. https://www.sciencedirect.com/science/article/pii/S0048969719310502?via%3Dihub</ref>).  Designers should maximize the degree of infiltration achieved within a grass swale by incorporating check dams and ensuring the native soils have infiltration rates of 15 mm/hr or greater or specifying that the soils be tilled and amended with compost prior to planting. Several of the factors that can significantly increase or decrease the pollutant removal capacity of swales are provided in the table below:
 +
 
 +
{|class="wikitable"
 +
|+Factors that Influence the Pollutant Removal Capacity of Swales
 +
|-
 +
!Factors that Reduce Removal Rates
 +
!Factors that Enhance Removal Rates
 +
|-
 +
|Longitudinal slope > 1%
 +
|Longitudinal slope < 1%
 +
|-
 +
|Measured soil infiltration rate < 15 mm/hr
 +
|Measured soil infiltration rate is 15 mm/hr or greater
 +
|-
 +
|Flow velocity within channel > 0.5 m/s during a 4 hour, 25 mm Chicago storm event
 +
|Flow velocity within channel is 0.5 m/s or less during a 4 hour, 25 mm Chicago storm event
 +
|-
 +
|No pretreatment
 +
|Pretreatment with vegetated filter strips, gravel diaphragms and/or sedimentation forebays
 +
|-
 +
|Side slopes steeper than 3:1 (H:V)
 +
|Side slopes 3:1 (H:V) or less
 +
|-
 +
|}
 +
 
 +
==Life Cycle Costs==
 +
To learn about Life Cycle Costs associated with this practice (i.e. Pre-construction, Excavation, Materials & Installation, Project Management, Overhead, Inspection and Maintenance, Rehabilitation and other associated costs), visit the [[Enhanced Swales: Life Cycle Costs]] page to view a cost estimate.  Alternatively you can use the [https://sustainabletechnologies.ca/lid-lcct/ STEP's Low Impact Development Life Cycle Costing Tool (LID LCCT)] to generate cost estimates customized to your own LID stormwater design project specifications.
 +
 
 +
Take a look at the [[Enhanced Swales: Life Cycle Costs]] page by clicking below for further details:
 +
 
 +
{{Clickable button|[[File:Construction Breakdown EnhancedSwales Full Infil.PNG|150 px|link=https://wiki.sustainabletechnologies.ca/wiki/Enhanced_Swales:_Life_Cycle_Costs]]}}
 +
 
 +
==External Links==
 +
[http://www.fao.org/docrep/006/ad082e/AD082e02.htm Food and Agriculture Organization (FAO) Conservation Guide of the United Nations]
 +
 
 +
 
 +
==Gallery==
 +
{{:Check dams: Gallery}}
  
----
+
==References==
 +
[[Category:Infiltration]]
 +
[[Category:Calculations]]
 +
[[Category:Green infrastructure]]

Latest revision as of 18:49, 10 March 2023

Curb CutCurb CutCurb CutSalt Tolerant Grass MixCheck DamsCheck DamsCheck DamsBermsGrassesSalt Tolerant Grass Mix
Skeleton schematic illustrating the installation of check dams with centralized, flow concentrating cutouts. Street runoff would enter the swale through sheet flow or curb cuts and flow across the filter strip on the left side of the image.A note: The following is an "image map", feel free to explore the image with your cursor and click on highlighted labels that appear to take you to corresponding pages on the Wiki.


The check dams are spaced slightly further apart than would be recommended to maximize infiltration capacity i.e. ponding isn't quite continuous between the dams.

This article is about installations designed to capture and convey surface runoff along a vegetated channel, whilst also promoting infiltration.

  • For underground conveyance which promotes infiltration, see Exfiltration trenches.
  • For conveyance along planted channels, on both surface and underground, see Bioswales.

Overview[edit]

Enhanced Grass Swales are vegetated open channels designed to convey, treat and attenuate stormwater runoff. Simple grass channels or ditches have long been used for stormwater conveyance, particularly for road drainage. Enhanced grass swales incorporate design features such as modified geometry and check dams that improve the contaminant removal and runoff reduction functions of simple grass channel and roadside ditch designs. Bioretention swales (i.e.bioswales, dry swales) incorporate filter media and possibly a perforated pipe underdrain to ensure they drain within the required drawdown time. Where development density, topography and depth to water table permit, swales are a preferable alternative to curb and gutter and storm drains as a stormwater conveyance system.

Enhanced swales are an ideal technology for:

  • Sloped sites,
  • Cheaply retrofitting and improving the performance of existing grass swales.

Take a look at the downloadable Enhanced Grass Swales Factsheet below for a .pdf overview of this LID Best Management Practice:

Enhanced swale.png


The fundamental components of an enhanced grassed swale are:

Additional components may include:

Planning considerations[edit]

When planning a new site, all swales and overground flow paths should be fitted perpendicular to existing contours. See Natural drainage and Existing hydrology.

Infiltration[edit]

Enhanced swales include check dams that can be designed to pond substantial volumes of water on the swale surface between flow events, so provide both stormwater conveyance and infiltration functions. For information about constraints to infiltration practices, and approaches and tools for identifying and designing within them see Infiltration.

Best cross sections[edit]

Both sections a)triangular and, b)trapezoidal, are constrained within ratios of 8:1 H:V
At lowest flow rates (smallest area) the trapezoidal swale (b) has the greater wetted perimeter; at higher flow rates (greater area) the triangular geometry (a)has a larger wetted perimeter for same area. Both channels modelled using ratios shown in figure above

Enhanced swales aim to both reduce the flow rate and retain a portion of the conveyed water. For these purposes the best x-section is that which maximizes the wetted perimeter for a given area. For a given width and depth, the difference between a triangular and trapzoidal section is small. As shown in the diagrams, under low flow conditions the trapezoidal has greater wetted perimeter, and at higher flows the triangular profile does.

Safety[edit]

As shallow grassed swales are a common roadside construction, the Ministry of Transport has created their own guide to maximum flow depth and freeboard[1][2]. Their advice has been prepared specifically for high risk environments and those stringent constraints should not be applied to all circumstances. In many urban environments the principle of applying check dams to enhance all surface BMPs can be safely used to encourage ponding and subsequent infiltration for a day or two.

Native Soil[edit]

Swales can be located over any soil type, but HSG A and B soils are best for achieving water balance objectives. Facilities should be located in portions of the site with the highest native soil infiltration rates. Where infiltration rates are less than 15 mm/hr (hydraulic conductivity less than 1x10-6 cm/s) an underdrain is recommended. Native soil infiltration rate at the proposed facility location and depth should be confirmed through in-situ measurements of hydraulic conductivity under field saturated conditions.

Wellhead Protection[edit]

Facilities receiving road or parking lot runoff should not be located within year 2 year time-of-travel wellhead protection areas (see local drinking water source protection plan).

Available Space[edit]

Reserve open space of about 5 to 20% of the size of the contributing drainage area. A width of at least 2 metres is needed

Site Topography[edit]

Contributing slopes should be between 1 to 5%. Swale longitudinal slopes may range from 0.5 to 6% (this prevents ponding while providing residence time and preventing erosion). On slopes steeper than 3%, check dams should be used. Check the Erosion and Sediment Control Guide

Water Table[edit]

Maintaining a separation of 1 m between the elevations of the base of the practice and the seasonally high water table, or top of bedrock is recommended. Lesser or greater values may be considered based on groundwater mounding analysis. See STEP LID Planning and Design Guide wiki page, Groundwater, for further guidance and spreadsheet tool.

Pollution Hot Spot Runoff[edit]

To protect groundwater from possible contamination, runoff from pollution hot spots (i.e. (e.g., vehicle fueling, servicing and demolition areas, outdoor storage and handling areas for hazardous materials and some heavy industry sites) should not be treated by swales designed for infiltration. Facilities designed with an impermeable liner (filtration only) can be used to treat runoff from hot spots.

Proximity to Underground Utilities[edit]

Designers should consult local utility design guidance for the horizontal and vertical clearance between storm drains, ditches and surface water bodies. Utilities running parallel to the grass swale should be offset from the centerline of the swale. Generally, underground utilities below the bottom of the swale are not a problem.

Karst[edit]

Swales designed for infiltration are not suitable in areas of known or implied karst topography.

Setback from Buildings[edit]

Should be set back a minimum of 4m from building foundations.


For a table summarizing information on planning considerations and site constraints see Site considerations.

Design[edit]

See: Enhanced swales: Specifications for further guidance regarding BMP sizing.

All swales should be designed to meet the following criteria:

  • Treat drainage areas of <2 hectares
  • Minimum residence time of 5 minutes.
  • Maximum flow velocity 0.3 m/s
  • Bottom width between 0.75 - 3.0 m
  • Minimum length 30 m
  • Minimum length between checkdams > 5m
  • Maximum depth of flow should be 50% height of grass for regularly mown swales, to a maximum of 100 mm, or 33% height of vegetation for infrequently mown swales
  • Cross-section shape may be parabolic or trapezoidal, but parabolic is preferable for aesthetics, maintenance and hydraulics.
Cross-section view of a parabolic designed swale. Source: Horry County, Southern California.[3].

Geometry and Site Layout[edit]

Minimum planting soil or filter media bed footprint area is based on the design storm runoff volume and effective surface ponding depth behind check dams. Recommended impervious drainage area to pervious facility footprint area ratios (I:P ratios) range from:

For sizing of grass swales, see the following suggested equations to calculate their capacity / retention: Retention swales

Pre-Treatment[edit]

Pre-treatment captures sediment before it reaches the filter bed. It is typically necessary unless runoff sediment load is very low (e.g. roof drainage). Pre-treatment options include:

  • level spreaders
  • stone filter inlets with geotextile fabric and,

catch basins with sump.

Planting Soil & Filter Media[edit]

Planting soil or filter media should come pre-mixed from an approved vendor.

Underdrains[edit]

Underdrains are recommended for bioswales where native soil infiltration rate <15 mm/h (hydraulic conductivity < 1x10-6 cm/s), and needed for non-infiltrating designs. They are comprised of a length of perforated pipe embedded near the top of the storage reservoir, with an overlying choker layer of medium-sized aggregate, and structures to provide inspection and maintenance access. Alternatively, the perforated pipe could be installed on the reservoir bottom and connected to an upturned pipe assembly or riser. Another option is to include a flow restrictor (e.g. orifice cap or valve) on the underdrain outlet pipe, to optimize infiltration while meeting the required drainage time.

Perforated Pipe[edit]

Continuously perforated pipe should be either smooth interior HDPE or PVC pipe with diameter ≥200 mm to reduce freezing risk and facilitate access by camera and cleaning equipment. Perforated pipe extends length of facility and solid pipe is used to connect to storm drain system.

Access Structures[edit]

The use of maintenance holes/vertical standpipes connected to the perforated pipe system are used for inspection and flushing, ensure couplings used for standpipe connections are 45° to facilitate pipe access by camera or cleaning equipment. (See to the right for example of couplings attaching to an underdrain pipe.

45 degs.PNG

Conveyance and Overflow[edit]

Swales can be designed to be inline or offline from the drainage system. Inline swales accepts all flow from the drainage area and conveys large event flows through an overflow outlet. Overflow structures must be sized to safely convey large event flows out of the facility. Options include flat, dome or ditch inlet catch basins connected to a storm sewer.

See: Overflow: Gallery for examples.

Monitoring Wells[edit]

A vertical standpipe consisting of an anchored 100 to 150 mm diameter pipe with perforations along the length within the reservoir, installed to the bottom of the facility, with a lockable cap. The well allows monitoring of inter-event drainage times with the use of a water level data logger sampler.

Planting Considerations[edit]

  • Grasses and herbaceous species with dense root structure cover should be favoured along the bottom of the swale for their ability to increase infiltration, stabilize soils, retain pollutants and assist with suspended solids.
  • Enhanced grass swales may be planted with sod or seed. Stabilize swale with erosion control blanket if planting with seed. Include a temporary cover crop in native seed mix.
  • The plant material on the slopes of grass channels must be capable of withstanding periodic inundation in addition to extended periods of drought. Species include grasses and groundcovers, as well as low shrub species.
  • Plants along the exterior of this zone act to slow the flow during stormwater events, reducing sedimentation and increasing infiltration. The root structure of this plant material also acts to reduce erosion.
  • Selected grasses or groundcovers for grassed swales should be allowed to grow between 75 to 150 mm to assist in filtering suspended solids from stormwater. Therefore these species are either shorter naturally, or tolerate periodic mowing.
  • When grasses grow taller they have a tendency to flatten down from the water flow.
  • Fine, close-growing species provide for good soil stabilization.
  • Species are salt-tolerant due to the typical location of grass channels along roadways and parking lots.
  • Erosion protection such as river stone or riprap will be required to dissipate the energy from incoming concentrated flow.
  • The channel must be vegetated immediately after grading. Preferably, the swale should be planted in the spring so that the vegetation can become established with minimal irrigation.

Inspection and Maintenance[edit]

Maintenance requirements for enhanced grass swales, and swales is similar to vegetated filter strips and typically involve a low level of activity after vegetation becomes established. Grass channel maintenance procedures are already in place at many municipal public works and transportation departments. These procedures should be compared to the recommendations provided on the Inspection and Maintenance: Enhanced Swales page to assure that the infiltration and water quality benefits of enhanced grass swales are preserved.

Routine roadside ditch maintenance practices such as scraping and re-grading should be avoided at swale locations. Vehicles should not be parked or driven on grass swales. For routine mowing, the lightest possible mowing equipment should be used to prevent soil compaction.

For swales located on private property, the property owner, resident or manager is responsible for maintenance as outlined in a legally binding maintenance agreement. Roadside swales in residential areas generally receive routine maintenance from homeowners who should be advised regarding recommended maintenance activities and ensure they do not build anything within or on the channel of the swale which could result in flooding or pooling on theirs or their neighbours' properties.


Take a look at the Inspection and Maintenance: Enhanced Swales page by clicking below for further details about proper inspection and maintenance practices:

link=https://wiki.sustainabletechnologies.ca/index.php title=Inspection_and_Maintenance:_Enhanced_Swales&action=edit

Construction Considerations[edit]

Properly installed enhanced swales should abide by the following recommendations:

  • Grass swales should be clearly marked before site work begins to avoid disturbance during construction.
  • No vehicular traffic, except that specifically used to construct the facility, should be allowed within the swale site.
  • Any accumulation of sediment that does occur within the swale must be removed during the final stages of grading to achieve the design cross section, see above, under the Design section.
  • Final grading and planting should not occur until the adjoining areas draining into the swale are stabilized. Flow should also not be diverted into the swale until the banks are stabilized.
  • Preferably, the swale should be planted in the spring so that the vegetation can become established with minimal irrigation.
  • Installation of erosion control matting or blanketing to stabilize soil during establishment of vegetation is highly recommended.
  • If sod is used, it should be placed with staggered ends and secured by rolling the sod. This helps to prevent gullies

Modeling[edit]

TTT.png

Swale element in TTT menu
Weir elements may be incorporated as check dams for detailed design

It is recommended that grass and enhanced grass swales be modelled using the 'Swale' element in the TTT. A 'swale' has to connect two existing elements within the TTT Bioswales or dry swales, which have amended filter media, should be modelled as bioretention cells. The alternative is to use the 'enhanced swale' within the LID toolbox, but this incorporates fewer design parameters (and doesn't account for infiltration).

A 'swale' as a conveyance element in the TTT (key parameters)
General Info
Upstream Node Name of node on the inlet end of the swale (higher elevation)
Downstream Node Name of node on the outlet end of the swale (lower elevation)
Manning's Roughness Lower numbers indicate less surface obstruction and result in faster flow.

Suggested range for mown grass (dependent on density) 0.03 – 0.06 [4]

Upstream Invert (m) Depth of swale invert above node invert at inlet end of the swale
Downstream Invert (m) Depth or elevation of the swale invert above the node invert at the outlet end of the swale
Cross section
Maximum Depth (m) Depth of the swale
Bottom Width (m) Bottom width of the trapezoidal swale
For a triangular channel, enter 0
Left Side Slope (m/m) Left side slope (run/rise). Suggested value of 3 or 4 if design permits.
Right Side Slope (m/m) Right side slope (run/rise). Suggested value of 3 or 4 if design permits.
Seepage (mm/hour) Infiltration rate of native (or amended) soil
Parameters for 'enhanced swales' in the LID toolbox of the TTT
Surface
Berm height (mm) This is the height of the curb which constrains the overland sheet flow of water. Where the bottom of the slope discharges directly into another LID facility without impedance, the value is 0.
Surface roughness (Manning’s n) Lower numbers indicate less surface obstruction and result in faster flow.

Suggested range for mown grass (dependent on density) 0.03 – 0.06 [4]

Surface slope (%) If the slope > 3%, use Check dams to create temporary ponding, increase infiltration, and slow flow to reduce erosion.
Swale side slopes (run/rise) Suggested value of 3 or 4 if design permits.

Materials[edit]

Resilient turf grasses are particularly useful in the design of vegetated filter strips, dry ponds and enhanced grass swales. The Ministry of Transportation have standardized a number of grass mixes[5]. The 'Salt Tolerant Mix' is of particular value for low impact development applications alongside asphalt roadways and paved walkways.

Canada #1 Ground Cover (salt tolerant mix)
Common name Scientific name Proportion
Tall Fescue Festuca arundinacea 25 %
Fults Alkali Grass Puccinellia distans 20 %
Creeping Red Fescue Festuca rubra 25 %
Perennial ryegrass Lolium perrenne 20 %
Hard Fescue Festuca trachyphylla 10 %
This rain garden in a school yard uses stone as both decorative edging and for erosion control.
This bioswale in a parking lot uses stone at the inlets and along the bottom of the swale to prevent erosion, as the sides are sloped.

For advice on aggregates used in underdrains, see Reservoir aggregate.

Stone or gravel can serve as a low maintenance decorative feature, but it may also serve many practical functions on the surface of an LID practice.

Stone for erosion control[edit]

Aggregates used to line swales or otherwise dissipate energy (e.g. in forebays) should have high angularity to increase the permissible shear stress applied by the flow of water. [6] However, in some surface landscaped applications there may be a desire to use a rounded aggregate such as 'river rock' for aesthetic reasons. Rounded stones should be of sufficient size to resist being moved by the flow of water. Typical stone for this purpose ranges between 50 mm and 250 mm in diameter. The larger the stone, the more energy dissipation.

  • Stone beds should be twice as thick as the largest stone's diameter.
  • If the stone bed is underlain by a drainage geotextile, annual inspection and possible replacement should be performed as there is a potential for clogging of this layer to occur.

Stone mulch[edit]

Finer inorganic mulch materials can be of value applied in areas with extended ponding times i.e. in the the centre of recessed, bowl shaped bioretention, stormwater planters, trenches or swale practices. Inorganic mulches resist movement from flowing water and do not float. Applying a thin layer of inorganic mulch over the top of wood based mulch has been shown to reduce migration of the underlying layer by around 25% [7]. Inorganic mulches which may be available locally, include:

  • Pea gravel
  • River rock/beach stone
  • Recycled glass
  • Crushed mussel shells

Check dams[edit]

Check dams are small dams or weirs constructed across a drainage ditch, swale, or channel to lower the speed of concentrated flows for a certain design range of storm events and to promote infiltration.

Check dams:

  • may be constructed of any resilient and waterproof material, including: rock gabions, earth berms, coarse aggregate or rip-rap, concrete or metal. Stone used in check dams should have minimum median diameter 25 - 75 mm.
  • for enhanced swales may be up to 0.6 m in height; the maximum design depth of ponded water should be ≤ 0.6 m.
  • designed for higher flow velocities should have spillways incorporated into their profile, to direct water to the centre of the swale.
  • are usually installed between 10 - 20 m along the swale. The spacing of dams should not exceed the horizontal distance from the toe of the upstream dam to the same elevation on the downstream dam.
  • should have energy dissipation and erosion control measures installed in the 1 - 2 m downstream. Examples include large aggregate or turf reinforcement

Sizing and spacing of check dams[edit]

Check dams.png

Check dams are a feature of enhanced grass swales. They promote infiltration and evaporation by promoting limited ponding. To design check dams into a swale:

  1. The height of each dam is determined by the depth of ponded water that will infiltrate in a specified period (often 48 - 72 hours). The infiltration may be through the turf grass or other plants directly into the native soil or some soil amendments may be proposed in the design.
  2. The gradient between the top of the lower check dam and the bottom of the upper one is called "compensation gradient" which is the future or final effective gradient of the swale. It is formed when material carried by flowing water fills the check dams to spillway level.
  3. Dams are usually installed between 10-20 m along the swale. The spaces between check dams can be determined according to the compensation gradient and the effective height of the dams. They are distributed such that the crest of each dam is at approximately the same elevation as the toe of the upstream dam. If the slope along the swale varies, so should the distance between the dams.
  4. The compensation gradient of enhanced swales must be < 1 % (0.5 % preferred).

The objective of these design recommendations are to maximize the distribution of ponded water along the whole BMP. Detailed design may require iteration of the dam heights and distances along each section of a long swale.


To estimate the depth of water that can be infiltrated into a surface within a given time:

Where:

  • y = the depth of ponded water in mm,
  • f' = the design infiltration rate in mm/hr (after correction, where required).
  • t = time in hrs

After surveying the longitudinal profile of the swale, the number of check dams for the swale can be calculated by using the following equation:

Where:

  • L: Length of swale (m)
  • Si: Initial existing slope ratio of the swale (rise/run)
  • Se: Desired effective slope of the enhanced swale (between 0.005 - 0.01, rise/run)
  • h: The average effective height of the check dams in m (excluding foundations)(suggest you use y, calculated above)

  • The first check dam should be constructed on a stable point in the gully such as a rock outcrop, the junction point of the gully to a road, the main stream or river, lake or reservoir.
  • If there is no such stable point, a counter-dam must be constructed. The distance between the first dam and the counter-dam must be at least two times the effective height of the first check dam.
  • The points where the ensuing check dams are to be built are determined according to the compensation gradient and the effective height of the check dams.
  • The effective height of the second check dam is determined by taking into account the depth of the swale, the depth of the spillway and the maximum height of the check dam.
  • In this way, all the other proposed check dam points can be calculated.

When spacing check dams, give preference to the narrowest parts of the swale in order to reduce construction costs. In this case, to establish the compensation gradient between the proposed check dams, proportionately increase the foundation depth of the upper check dam when the space between the lower and upper check dam is extended. When the space is shortened, decrease the foundation depth. As the foundation depth is increased, the total height of the check dam (effective height plus foundation depth) should not exceed the permissible, maximum total height.


Example Calculation[edit]

An enhanced swale of 42 m has an existing longitudinal slope of 6 %. The underlying soil has been amended to infiltrate at 16 mm/hr (after safety correction applied); the regulatory authority requires that ponded water must not remain for over 48 hours. The maximum height of the check dams (h) to prevent extended ponding is::

But the maximum recommended depth of check dams is 0.6 m (600 mm).

(As an aside, these will drain in )

The current vertical distance along the swale is::

The desired effective slope to slow flow is 0.5%. The vertical distance along the swale with compensation gradient is::

The number of check dams required is::

This is rounded up to 4 dams, creating 5 ponding zones::

So the four check dams will be 0.6 m high and spaced every 8.4 m along the swale. These are fairly close together, but this construction is achievable and the dimensions are not remarkable, given the change in gradient is an order of magnitude.

Performance[edit]

Ability of Swales to Meet Stormwater Management Objectives
BMP Water Balance Water Quality Erosion Control
Swale with no underdrain Partial-based on available storage volume and native soil infiltration rate Yes-size for water quality storage requirement and maximum flow rate 0.5 m/s Partial-based on available storage volume and native soil infiltration rate
Swale with underdrain or partial infiltration Partial-based on available storage volume beneath the underdrain and soil infiltration rate Yes-size for water quality storage requirement Partial-based on available storage, native soil infiltration rate and if a flow restrictor is used
Swale with underdrain and impermeable liner or no infiltration Partial-some volume reduction through evapo-transpiration Yes-size for water quality storage requirement Partial-based on available storage volume and if a flow restrictor is used

Water Balance[edit]

Recent research indicates that a conservative runoff reduction rate of 10 to 20% can be used depending on whether soils fall in hydrologic soil groups A/B or C/D, respectively. The runoff reduction rates can be doubled if the native soils on which the swale is located have been tilled to a depth of 300 mm and amended with compost to achieve an organic content of between 8 and 15% by weight or 30 to 40% by volume. The main contributing factors that influence runoff reduction rates for swales are:

Volumetric runoff reduction from enhanced swales
LID Practice Location Runoff Reduction* Reference
Grass Swale Brampton 15 to 35%, STEP (2018)[8]
Sweden 40 to 55%, Rujner et al. (2016)[9]
Seoul, Korea 40 to 75%, Rujner et al. (2016)[10]
Maryland 59% Davis et al. (2012)[11]
Los Angeles 52.5%, Ackerman and Stein (2008)[12]
Various Locations 40% Strecker et al.(2004)[13]
France 27 to 41% Barrett et al. (2004)[14]
Virginia 0% Schueler (1983)[15]
Runoff Reduction Estimate* 45% on HSG A or B soils;

10% on HSG C or D soils

Water Quality[edit]

Research has shown the pollutant mass removal rates of grass swales are variable, depending on influent pollutant concentrations (Bäckström et al., 2006)[16], but generally moderate for most pollutants (Barrett et al., 1998[17]; Deletic and Fletcher, 2006[18]). Median pollutant mass removal rates of swales from available performance studies are 76% for total suspended solids, 55% for total phosphorus, and 50% for total nitrogen (Deletic and Fletcher, 2006[19]). Significant reductions in total zinc and copper event mean concentrations have been observed in performance studies with a median value of 60%, but results have varied widely (Barrett, 2008[20]). Site specific factors such as slope, soil type, infiltration rate, swale length and vegetative cover also affect pollutant mass removal rates. In general, the dominant pollutant removal mechanism operating in grass swales is infiltration, rather than filtration, because pollutants trapped on the surface of the swale by vegetation or check dams are not permanently bound (Bäckström et al., 2006[21]). In a recent international research review on processes for improving stormwwater quality treatment of grass swales and vegetated filter strips, Gavric et al. note that while understanding of hydrology and hydraulics of these stormwater control measures is adequate, there are knowledge gaps in understanding water quality treatment processes, particularly for nutrients, traffic associated organic contaminants, and bacteria (Gavric et al., 2019 [22]). Designers should maximize the degree of infiltration achieved within a grass swale by incorporating check dams and ensuring the native soils have infiltration rates of 15 mm/hr or greater or specifying that the soils be tilled and amended with compost prior to planting. Several of the factors that can significantly increase or decrease the pollutant removal capacity of swales are provided in the table below:

Factors that Influence the Pollutant Removal Capacity of Swales
Factors that Reduce Removal Rates Factors that Enhance Removal Rates
Longitudinal slope > 1% Longitudinal slope < 1%
Measured soil infiltration rate < 15 mm/hr Measured soil infiltration rate is 15 mm/hr or greater
Flow velocity within channel > 0.5 m/s during a 4 hour, 25 mm Chicago storm event Flow velocity within channel is 0.5 m/s or less during a 4 hour, 25 mm Chicago storm event
No pretreatment Pretreatment with vegetated filter strips, gravel diaphragms and/or sedimentation forebays
Side slopes steeper than 3:1 (H:V) Side slopes 3:1 (H:V) or less

Life Cycle Costs[edit]

To learn about Life Cycle Costs associated with this practice (i.e. Pre-construction, Excavation, Materials & Installation, Project Management, Overhead, Inspection and Maintenance, Rehabilitation and other associated costs), visit the Enhanced Swales: Life Cycle Costs page to view a cost estimate. Alternatively you can use the STEP's Low Impact Development Life Cycle Costing Tool (LID LCCT) to generate cost estimates customized to your own LID stormwater design project specifications.

Take a look at the Enhanced Swales: Life Cycle Costs page by clicking below for further details:

Construction Breakdown EnhancedSwales Full Infil.PNG

External Links[edit]

Food and Agriculture Organization (FAO) Conservation Guide of the United Nations


Gallery[edit]

Also see Jen's Pinterest board of check dams

References[edit]

  1. Ontario Ministry of Transportation, & Ontario Ministry for Transportation. (2016). Stormwater Management Requirements for Land Development Proposals. Retrieved February 26, 2018, from http://www.mto.gov.on.ca/english/publications/drainage/stormwater/section8.shtml#controls
  2. Drainage and Hydrology Section Transportation Engienering Branch Quality and Standards Division. (1997). MTO Drainage Management Manual. Retrieved from http://www.ontla.on.ca/library/repository/mon/12000/198363.pdf
  3. Horry County Government. 2022. Stormwater Engineers - Plans and the Construction Process. https://www.horrycounty.org/Departments/Stormwater/engineers
  4. 4.0 4.1 Oregon State Univ., Corvallis. Dept. of Civil, Construction and Environmental Engineering.; Environmental Protection Agency, Cincinnati ONRMRL. Storm Water Management Model Reference Manual Volume I Hydrology (Revised). 2016:233.https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P100NYRA.txt Accessed August 23, 2017.
  5. Ontario Provincial Standard Specification. (2023). Construction Specification and for Vegetative Cover OPSS.PROV 803. Retrieved from https://tcp.mto.gov.on.ca/notice/000-0140
  6. Roger T. Kilgore and George K. Cotton, (2005) Design of Roadside Channels with Flexible Linings Hydraulic Engineering Circular Number 15, Third Edition https://www.fhwa.dot.gov/engineering/hydraulics/pubs/05114/05114.pdf
  7. Simcock, R and Dando, J. 2013. Mulch specification for stormwater bioretention devices. Prepared by Landcare Research New Zealand Ltd for Auckland Council. Auckland Council technical report, TR2013/056
  8. Sustainable Technologies Evaluation Program. Effectiveness of Retrofitted Roadside Biofilter Swales - County Court Boulevard, Brampton. Technical Brief. https://sustainabletechnologies.ca/app/uploads/2020/11/CC-Bioswale-Tech-brief-2018-FINAL.pdf. https://sustainabletechnologies.ca/app/uploads/2020/11/CC-Bioswale-Tech-brief-2018-FINAL.pdf
  9. Rujner, H., Leonhardt, G., Perttu, A.M., Marsalek, J. and Viklander, M. 2016. Advancing green infrastructure design: Field evaluation of grassed urban drainage swales. Modélisation/Models-Contrôle à la source/Source control. http://documents.irevues.inist.fr/bitstream/handle/2042/60477/3B7P03-124RUJ.pdf
  10. Rujner, H., Leonhardt, G., Perttu, A.M., Marsalek, J. and Viklander, M. 2016. Advancing green infrastructure design: Field evaluation of grassed urban drainage swales. Modélisation/Models-Contrôle à la source/Source control. http://documents.irevues.inist.fr/bitstream/handle/2042/60477/3B7P03-124RUJ.pdf
  11. Davis, A.P., Stagge, J.H., Jamil, E. and Kim, H. 2012. Hydraulic performance of grass swales for managing highway runoff. Water research, 46(20), pp.6775-6786. http://www.jstagge.com/assets/papers/Hydraulic%20performance%20of%20grass%20swales%20for%20managing.pdf
  12. Ackerman, D. and Stein, E.D. 2008. Evaluating the effectiveness of best management practices using dynamic modeling. Journal of Environmental Engineering, 134(8), pp.628-639. https://www.researchgate.net/profile/Eric-Stein-2/publication/228910558_Evaluating_the_Effectiveness_of_Best_Management_Practices_Using_Dynamic_Modeling/links/0912f509278915fc77000000/Evaluating-the-Effectiveness-of-Best-Management-Practices-Using-Dynamic-Modeling.pdf
  13. Strecker, E., Quigley, M., Urbonas, B., Jones, J. 2004. State-of-the-art in comprehensive approaches to stormwater. The Water Report. Issue 6. August 15,2004.
  14. Barrett, M.E. 2008. Comparison of BMP Performance Using the International BMP Database. Journal of Irrigation and Drainage Engineering. September/October. pp. 556-561
  15. Schueler, T. 1983. Washington Area Nationwide Urban Runoff Project. Final Report. Metropolitan Washington Council of Governments. Washington, DC.
  16. Bäckström, M., Viklander, M. and Malmqvist, P.A. 2006. Transport of stormwater pollutants through a roadside grassed swale. Urban Water Journal, 3(2), pp.55-67. https://www.mdpi.com/2073-4441/6/7/1887/htm
  17. Barrett, M.E., Walsh, P.M. Malina Jr., J.F. and Charbeneau, R.J. 1998. Performance of Vegetative Controls for Treating Highway Runoff. Journal of Environmental Engineering. November 1998. pp. 1121-1128.
  18. Deletic, A., and Fletcher, T.D. 2006. Performance of grass filters used for stormwater treatment – a field and modelling study. Journal of Hydrology. Vol. 317. pp. 261-275.
  19. Deletic, A., and Fletcher, T.D. 2006. Performance of grass filters used for stormwater treatment – a field and modelling study. Journal of Hydrology. Vol. 317. pp. 261-275.
  20. Barrett, M.E. 2008. Comparison of BMP performance using the international BMP database. Journal of Irrigation and Drainage Engineering, 134(5), pp.556-561.
  21. Bäckström, M., Viklander, M. and Malmqvist, P.A. 2006. Transport of stormwater pollutants through a roadside grassed swale. Urban Water Journal, 3(2), pp.55-67. https://www.mdpi.com/2073-4441/6/7/1887/htm
  22. Gavric.S, Leonhardt, G., Marsalek, J., Viklander, M. 2019. Processes improving urban stormwater quality in grass swales and filter strips: A review of research findings. Science of the Total Environment. v 669. pp. 431-447. https://www.sciencedirect.com/science/article/pii/S0048969719310502?via%3Dihub