Below are capital and life cycle cost estimates for the extensive, 4 inch deep sedum mat [[Green roofs| green roof]] design configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 4% of total life cycle costs over the 25-year evaluation period, and increase to only 6% of total life cycle costs over the 50-year period.
+
Below are capital and life cycle cost estimates for the extensive, 4 inch deep sedum mat [[Green roofs| green roof]] design configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 12% of total life cycle costs over the 25-year evaluation period, and increase to 18% of total life cycle costs over the 50-year period.