Changes

Jump to navigation Jump to search
Line 68: Line 68:     
==Cost Summary Tables==
 
==Cost Summary Tables==
Total life cycle cost estimates for the two [[Infiltration trenches|infiltration trench]] design configurations vary substantially with the [[Infiltration trenches|Infiltration Trench: Partial Infiltration]] design being highest ($183.197.71), followed closely by the [[Infiltration trenches|Infiltration Trench: Full Infiltration]] design being ($150,128.87).<br>
+
Total life cycle cost estimates over the 50 year evaluation period for the two [[Infiltration trenches|infiltration trench]] design configurations vary substantially with the [[Infiltration trenches|Infiltration Trench: Partial Infiltration]] design being highest ($183.197.71), followed closely by the [[Infiltration trenches|Infiltration Trench: Full Infiltration]] design being ($150,128.87).<br>
    
It is notable that a sensitivity analysis was conducted in 2019 to compare construction cost estimates generated by the tool to actual costs of implemented projects. '''The analysis found that tool estimates were typically within ±14% of actual construction costs'''<ref>Credit Vally Conservation (CVC). 2019. Life-cycle costing tool 2019 update: sensitivity analysis. Credit Valley Conservation, Mississauga, Ontario. https://sustainabletechnologies.ca/app/uploads/2020/04/LCCT-Sensitivity-Analysis_March2020.pdf</ref>
 
It is notable that a sensitivity analysis was conducted in 2019 to compare construction cost estimates generated by the tool to actual costs of implemented projects. '''The analysis found that tool estimates were typically within ±14% of actual construction costs'''<ref>Credit Vally Conservation (CVC). 2019. Life-cycle costing tool 2019 update: sensitivity analysis. Credit Valley Conservation, Mississauga, Ontario. https://sustainabletechnologies.ca/app/uploads/2020/04/LCCT-Sensitivity-Analysis_March2020.pdf</ref>

Navigation menu