Changes

Jump to navigation Jump to search
Line 397: Line 397:  
When this case study document is used with the above Contractors document, the Wiki and former SWM guidance documents, you can gain a comprehensive understanding of how to ensure an LID project is successful through design, tender, construction, and commissioning. Click the button above to learn more.
 
When this case study document is used with the above Contractors document, the Wiki and former SWM guidance documents, you can gain a comprehensive understanding of how to ensure an LID project is successful through design, tender, construction, and commissioning. Click the button above to learn more.
    +
{{Clickable button|[[File:SWM problems.PNG|150 px|link=https://sustainabletechnologies.ca/app/uploads/2021/05/Aggregated-Retrofits-Project-Synopsis_STEP-Case-Study-Temp_altV4.pdf]]}}
 +
 +
Technical brief by STEP discussing the current problem with urban stormwater management and how "A Made in Ontario Solution" utilizing the Drainage Act. This solution is being tested by CVC, with funding support from the Federation of Canadian Municipalities (FCM), by implementing at source, low impact development (LID) stormwater infrastructure on private lands using property aggregation and a communal design, build and maintenance approach. read more by clicking the button above.
    
Read more about [[Construction]] Considerations here.
 
Read more about [[Construction]] Considerations here.

Navigation menu