Changes

Jump to navigation Jump to search
no edit summary
Line 51: Line 51:  
|5:1 to 10:1||Not applicable||1 to 3||5 to 15||0.5 to 6||No||4m- Building Foundation<br>Underground Utilities||No||2 Yr
 
|5:1 to 10:1||Not applicable||1 to 3||5 to 15||0.5 to 6||No||4m- Building Foundation<br>Underground Utilities||No||2 Yr
 
|-
 
|-
|'''[[Bioswales]] (Dry swale)'''
+
|'''[[Bioswales]] (Dry swales)'''
 
|1 (infiltrating); Not applicable (non-infiltrating)
 
|1 (infiltrating); Not applicable (non-infiltrating)
 
|5:1 to 15:1||Underdrain recommended <br> if < 15 mm/hr||1 to 3||5 to 10||0.5 to 6||No (infiltrating); Yes (non-infiltrating)||4m (3m if impermeable liner<br>is used) Building foundation,<br> Underground utilities,<br> Drinking Water Wellhead Protection Areas||No (infiltrating); Yes (non-infiltrating)||2 Yr (infiltrating); None (non-infiltrating)
 
|5:1 to 15:1||Underdrain recommended <br> if < 15 mm/hr||1 to 3||5 to 10||0.5 to 6||No (infiltrating); Yes (non-infiltrating)||4m (3m if impermeable liner<br>is used) Building foundation,<br> Underground utilities,<br> Drinking Water Wellhead Protection Areas||No (infiltrating); Yes (non-infiltrating)||2 Yr (infiltrating); None (non-infiltrating)

Navigation menu