Line 39:
Line 39:
Where:<br>
Where:<br>
−
A<sub>c</sub> = A<sub>i</sub> + A<sub>p</sub>, and
+
A<sub>c</sub> = A<sub>i</sub> + A<sub>p</sub>, and<br>
A<sub>r</sub> = A<sub>p</sub> (i.e., assumed that the water storage reservoir area and permeable pavement area are the same)
A<sub>r</sub> = A<sub>p</sub> (i.e., assumed that the water storage reservoir area and permeable pavement area are the same)
<br>
<br>