Changes

Jump to navigation Jump to search
Line 25: Line 25:  
*''f''' = Design infiltration rate (mm/hr), and
 
*''f''' = Design infiltration rate (mm/hr), and
 
*''t'' = [[Drainage time]] (hrs), e.g. 72 hours, check local regulations for drainage time requirements.   
 
*''t'' = [[Drainage time]] (hrs), e.g. 72 hours, check local regulations for drainage time requirements.   
*''n'' = Porosity of [[Reservoir aggregate|clear stone]]}}
+
*''n'' = Porosity of the stone bed aggregate material (typically 0.4 for 50 mm dia. [[reservoir aggregate|clear stone]])}}  
    
----
 
----

Navigation menu