− | Maintaining a separation of one (1) metre between the elevations of the base of the practice and the seasonally high water table, or top of bedrock is recommended. Lesser or greater values may be considered based on groundwater mounding analysis. See [[STEP LID Planning and Design Guide]] wiki page, Groundwater for further guidance and spreadsheet tool. | + | Maintaining a separation of one (1) metre between the elevations of the base of the practice and the seasonally high water table, or top of bedrock is recommended. Lesser or greater values may be considered based on groundwater mounding analysis. See STEP LID Planning and Design Guide wiki page, [[Groundwater]] for further guidance and spreadsheet tool. |