Difference between revisions of "Permeable pavements: Gallery"
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
Downloading.JPG|Inspection [[wells]] should be located at the edges or even off the side of permeable pavement areas | Downloading.JPG|Inspection [[wells]] should be located at the edges or even off the side of permeable pavement areas | ||
IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON | IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON | ||
− | |||
perviousconcrete.png|Pervious concrete walkway plaza (Source: Villanova Urban Stormwater Partnership) | perviousconcrete.png|Pervious concrete walkway plaza (Source: Villanova Urban Stormwater Partnership) | ||
PICPDouble.png|PICP on a road with concrete edge restraints separating the impervious and permeable pavements (source STEP) | PICPDouble.png|PICP on a road with concrete edge restraints separating the impervious and permeable pavements (source STEP) |
Revision as of 18:30, 13 August 2020
Permeable pavers in parking bays, Mississauga ON (note inspection of bioretention occurring in the background)
Inspection wells should be located at the edges or even off the side of permeable pavement areas