Difference between revisions of "Permeable pavements: Gallery"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 12: Line 12:
 
Downloading.JPG|Inspection [[wells]] should be located at the edges or even off the side of permeable pavement areas
 
Downloading.JPG|Inspection [[wells]] should be located at the edges or even off the side of permeable pavement areas
 
IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON
 
IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON
Gridpaver.png.jpg|Permeable grid system filled with gravel
 
 
perviousconcrete.png|Pervious concrete walkway plaza (Source: Villanova Urban Stormwater Partnership)
 
perviousconcrete.png|Pervious concrete walkway plaza (Source: Villanova Urban Stormwater Partnership)
 
PICPDouble.png|PICP on a road with concrete edge restraints separating the impervious and permeable pavements (source STEP)
 
PICPDouble.png|PICP on a road with concrete edge restraints separating the impervious and permeable pavements (source STEP)

Revision as of 18:30, 13 August 2020