Difference between revisions of "Permeable pavements: Gallery"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
Frankenthal - Versickerungsfähige Pflaster.jpg|Permeable Interlocking Concrete Pavement, Germany (Source: Alexander Eichler) | Frankenthal - Versickerungsfähige Pflaster.jpg|Permeable Interlocking Concrete Pavement, Germany (Source: Alexander Eichler) | ||
Concrete grid paving.jpg|Laneways retrofit program, Toronto ON | Concrete grid paving.jpg|Laneways retrofit program, Toronto ON | ||
− | |||
Lakeside - permeable concrete 1.JPG| Permeable concrete at Lakeside Park, Mississauga ON | Lakeside - permeable concrete 1.JPG| Permeable concrete at Lakeside Park, Mississauga ON | ||
− | |||
− | |||
Wychwood Permeable Pavers.jpg|Permeable pavers on residential driveways, Brampton ON | Wychwood Permeable Pavers.jpg|Permeable pavers on residential driveways, Brampton ON | ||
Meadows in the Glen PP sidewalk and driveway bibs .jpg|Permeable pavers on a shared street, Georgetown ON | Meadows in the Glen PP sidewalk and driveway bibs .jpg|Permeable pavers on a shared street, Georgetown ON | ||
Line 15: | Line 12: | ||
PICPchicago.jpg|Permeable Interlocking Concrete Pavement (PICP) on a narrow road between buildings in Chicago (Source: ICPI) | PICPchicago.jpg|Permeable Interlocking Concrete Pavement (PICP) on a narrow road between buildings in Chicago (Source: ICPI) | ||
CVC Head Office Parking lot.jpg|Different colours of permeable pavers in parking lot, CVC headquarters, Mississauga ON | CVC Head Office Parking lot.jpg|Different colours of permeable pavers in parking lot, CVC headquarters, Mississauga ON | ||
− | |||
− | |||
Downloading.JPG|Inspection [[wells]] should be located at the edges or even off the side of permeable pavement areas | Downloading.JPG|Inspection [[wells]] should be located at the edges or even off the side of permeable pavement areas | ||
IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON | IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON | ||
Gridpaver.png.jpg|Permeable grid system filled with gravel | Gridpaver.png.jpg|Permeable grid system filled with gravel | ||
− | |||
perviousconcrete.png|Pervious concrete walkway plaza (Source: Villanova Urban Stormwater Partnership) | perviousconcrete.png|Pervious concrete walkway plaza (Source: Villanova Urban Stormwater Partnership) | ||
PICPDouble.png|PICP on a road with concrete edge restraints separating the impervious and permeable pavements (source STEP) | PICPDouble.png|PICP on a road with concrete edge restraints separating the impervious and permeable pavements (source STEP) |
Revision as of 18:28, 13 August 2020
Permeable pavers in parking bays, Mississauga ON (note inspection of bioretention occurring in the background)
Inspection wells should be located at the edges or even off the side of permeable pavement areas