Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1:  
==Plan checklist==
 
==Plan checklist==
#Do the plans include an appropriate construction sequence that is specific to the construction of the [[permeable pavement]]?
+
#Do the plans include an appropriate construction sequence that is specific to the construction of the [[permeable pavements|permeable pavement]]?
 
#To avoid soil disturbance and compaction during construction, will the proposed infiltration area be clearly marked before any site work begins?
 
#To avoid soil disturbance and compaction during construction, will the proposed infiltration area be clearly marked before any site work begins?
 
#Do the plans include an appropriate cross-sectional detail for the permeable pavement?
 
#Do the plans include an appropriate cross-sectional detail for the permeable pavement?
339

edits

Navigation menu