Changes

Jump to navigation Jump to search
Line 25: Line 25:  
* geo-grids for sites with heavy vehicle loading
 
* geo-grids for sites with heavy vehicle loading
 
* monitoring wells and clean-outs
 
* monitoring wells and clean-outs
<gallery mode="packed-hover" perrow=5 widths=100px heights=200px>
+
<gallery mode="packed-overlap" perrow=5 widths=50px heights=50px>
 
File:PICPDouble.png|Permeable Interlocking Concrete Pavers (PICP) on a road with concrete edge restraints separating the impervious and permeable pavements.
 
File:PICPDouble.png|Permeable Interlocking Concrete Pavers (PICP) on a road with concrete edge restraints separating the impervious and permeable pavements.
 
File:Gridpaver.png.jpg|Permeable Grid System filled with gravel.
 
File:Gridpaver.png.jpg|Permeable Grid System filled with gravel.
339

edits

Navigation menu