Changes

Jump to navigation Jump to search
Line 101: Line 101:  
<math>d_{a}= f' t </math>
 
<math>d_{a}= f' t </math>
 
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
*f' = Design infiltration rate of underlying native soil (m/h)
+
*f' = [[Design infiltration rate]] of underlying native soil (m/h)
 
*t = [[Drainage time]] (h). Check provincial or local criteria for drainage time requirements}}<br>
 
*t = [[Drainage time]] (h). Check provincial or local criteria for drainage time requirements}}<br>
 
For practices with the underdrain perforated pipe installed on the bottom of the storage reservoir and connected to a riser (e.g., standpipe and 90 degree coupling), the active storage component is the storage reservoir depth between the inverts of the reservoir bottom and riser outlet (i.e invert elevation of the 90 degree coupling) and is calculated the same way as above.<br>
 
For practices with the underdrain perforated pipe installed on the bottom of the storage reservoir and connected to a riser (e.g., standpipe and 90 degree coupling), the active storage component is the storage reservoir depth between the inverts of the reservoir bottom and riser outlet (i.e invert elevation of the 90 degree coupling) and is calculated the same way as above.<br>

Navigation menu