Difference between revisions of "TRIECA2019"

From LID SWM Planning and Design Guide
Jump to: navigation, search
m
m
Line 22: Line 22:
 
{{#l:Temp training file.xlsx|Beta version drainage spreadsheet}}
 
{{#l:Temp training file.xlsx|Beta version drainage spreadsheet}}
  
===LID lifecycle costing===
+
==LID lifecycle costing==
 
*[https://sustainabletechnologies.ca/home/urban-runoff-green-infrastructure/low-impact-development/low-impact-development-life-cycle-costs/ LID costing project page]
 
*[https://sustainabletechnologies.ca/home/urban-runoff-green-infrastructure/low-impact-development/low-impact-development-life-cycle-costs/ LID costing project page]

Revision as of 18:01, 17 March 2019


MOE 2003 on Infiltration Trenches

Source water Protection

Hydrogeo data in Ontario

Oakridges Water

Provincial Groundwater Monitoring Network

Groundwater Information Network

Ontario GroundwaterThe water below the surface, and typically below the groundwater table.

Surficial geology of southern Ontario

Darcy DrainageNatural or artificial means of intercepting and removing surface or subsurface water (usually by gravity).

Beta version drainage spreadsheet

LIDLow Impact Development. A stormwater management strategy that seeks to mitigate the impacts of increased urban runoff and stormwater pollution by managing it as close to its source as possible. It comprises a set of site design approaches and small scale stormwater management practices that promote the use of natural systems for infiltration and evapotranspiration, and rainwater harvesting. lifecycle costing