Changes

Jump to navigation Jump to search
m
Line 1: Line 1:  
Understanding site conditions is critical when [[Screening LID Options]]. Gaining comprehensive knowledge of the proposed site requires a desktop review of relevant background information followed by field reconnaissance to verify the review and identify relevant site conditions not included in background information.   
 
Understanding site conditions is critical when [[Screening LID Options]]. Gaining comprehensive knowledge of the proposed site requires a desktop review of relevant background information followed by field reconnaissance to verify the review and identify relevant site conditions not included in background information.   
== Desktop Analysis of Background Information ==
+
==Desktop analysis==
 
Reviewing background information will help provide preliminary understanding of side conditions, scope technical investigations for the site and determine project targets. It’s best to collect and review this information prior to field reconnaissance so that it is a targeted and efficient use of time.  
 
Reviewing background information will help provide preliminary understanding of side conditions, scope technical investigations for the site and determine project targets. It’s best to collect and review this information prior to field reconnaissance so that it is a targeted and efficient use of time.  
   Line 9: Line 9:  
* Structural reports and plans (to assess greenroof suitability)
 
* Structural reports and plans (to assess greenroof suitability)
 
* Servicing drawings (hydro, phone, gas, cable, and other utilities)
 
* Servicing drawings (hydro, phone, gas, cable, and other utilities)
* Grading plans
+
* [[Grading]] plans
 
* Stormwater management and drainage reports
 
* Stormwater management and drainage reports
 
* Sump-pump and/or foundation drain connection information
 
* Sump-pump and/or foundation drain connection information
Line 28: Line 28:  
</div>
 
</div>
   −
== Field Reconnaissance of Site Conditions ==
+
==Field Reconnaissance==
 
When documenting side conditions for commercial, industrial, and multi-residential sites, investigate the following:
 
When documenting side conditions for commercial, industrial, and multi-residential sites, investigate the following:
 
<div style="column-count:2;-moz-column-count:2;-webkit-column-count:2">
 
<div style="column-count:2;-moz-column-count:2;-webkit-column-count:2">
Line 57: Line 57:  
Once the analysis is complete, proceed to developing a list of recommended BMPs for implementation.
 
Once the analysis is complete, proceed to developing a list of recommended BMPs for implementation.
 
===See also===
 
===See also===
[[LID opportunities on industrial, commercial and multi-res]]
+
[[LID opportunities in industrial, commercial and multi-residential types]]
 
[[Category:Planning]]
 
[[Category:Planning]]
390

edits

Navigation menu