Changes

Jump to navigation Jump to search
m
Line 9: Line 9:  
* Structural reports and plans (to assess greenroof suitability)
 
* Structural reports and plans (to assess greenroof suitability)
 
* Servicing drawings (hydro, phone, gas, cable, and other utilities)
 
* Servicing drawings (hydro, phone, gas, cable, and other utilities)
* Grading plans
+
* [[Grading]] plans
 
* Stormwater management and drainage reports
 
* Stormwater management and drainage reports
 
* Sump-pump and/or foundation drain connection information
 
* Sump-pump and/or foundation drain connection information
Line 57: Line 57:  
Once the analysis is complete, proceed to developing a list of recommended BMPs for implementation.
 
Once the analysis is complete, proceed to developing a list of recommended BMPs for implementation.
 
===See also===
 
===See also===
[[LID opportunities on industrial, commercial and multi-res]]
+
[[LID opportunities in industrial, commercial and multi-residential types]]
 
[[Category:Planning]]
 
[[Category:Planning]]
390

edits

Navigation menu