Difference between revisions of "Permeable pavements: TTT"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
m (Sahlla Abbasi moved page Permeable paving: TTT to Permeable pavements: TTT: Updating terminology for permeable paving to permeable pavements)
 
(13 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{Clickable button|[[File:TTT.png|400 px|link=http://www.sustainabletechnologies.ca/wp/low-impact-development-treatment-train-tool/]]}}
+
{{Clickable button|[[File:TTT.png|350 px|link=http://www.sustainabletechnologies.ca/wp/low-impact-development-treatment-train-tool/]]}}
 +
[[File:LID TTT.png|thumb|[[Permeable pavements]] is found within the LID toolbox]]
 
{| class="wikitable"
 
{| class="wikitable"
 
|-
 
|-
 
!colspan = "2" style="background: darkcyan; color: white; align = center"|Surface
 
!colspan = "2" style="background: darkcyan; color: white; align = center"|Surface
 
|-
 
|-
|width = 210px|Berm height (mm)||This is the height of the curb which constrains the overland sheet flow of water. Where curb cuts or other outlet exists at the lowest point of the pavement, the suggested value is 0.  
+
|width = 210px|[[Berm]] height (mm)||This is the height of the curb which constrains the overland sheet flow of water. Where [[curb cuts]] or other outlet exists at the lowest point of the pavement, the suggested value is 0.  
 
|-
 
|-
|Surface roughness (Manning’s n)||Lower numbers indicate less surface obstruction and result in faster flow.
+
|Surface roughness ([[Manning’s n]])||Lower numbers indicate less surface obstruction and result in faster flow.
 
Suggested range for pavement 0.01 – 0.02 <ref name = SWMM> Oregon State Univ., Corvallis. Dept. of Civil, Construction and Environmental Engineering.; Environmental Protection Agency, Cincinnati ONRMRL. Storm Water Management Model Reference Manual Volume I Hydrology (Revised). 2016:233. https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P100NYRA.txt  Accessed August 23, 2017.</ref>
 
Suggested range for pavement 0.01 – 0.02 <ref name = SWMM> Oregon State Univ., Corvallis. Dept. of Civil, Construction and Environmental Engineering.; Environmental Protection Agency, Cincinnati ONRMRL. Storm Water Management Model Reference Manual Volume I Hydrology (Revised). 2016:233. https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P100NYRA.txt  Accessed August 23, 2017.</ref>
 
|-
 
|-
|Surface slope (%)||Typically between 1 – 4% (>2% recommended[[Winter#Site planning|see Effective grading]])
+
|Surface [[slope]] (%)||Typically between 1 – 4% (>2% recommended [[Salt management|Effective grading]])
 
|-
 
|-
 
!colspan = "2" style="background: darkcyan; color: white; align = center"|Pavement
 
!colspan = "2" style="background: darkcyan; color: white; align = center"|Pavement
Line 15: Line 16:
 
|Thickness (mm)||This is the thickness of just the pre-cast blocks (or depth of asphalt/concrete poured in place).
 
|Thickness (mm)||This is the thickness of just the pre-cast blocks (or depth of asphalt/concrete poured in place).
 
|-
 
|-
|Void ratio||This most commonly refers to the jointing material used between precast blocks. Suggest range 0.35 – 0.4 unless otherwise tested. Where a pervious product is poured in place, an appropriate figure should be obtained from the manufacturer.
+
|Void ratio||This most commonly refers to the jointing material used between precast blocks. Suggest 0.4 unless otherwise tested. Where a pervious product is poured in place, an appropriate figure should be obtained from the manufacturer.
 
|-
 
|-
 
|Impervious surface fraction||This is the proportion of the total pavement taken up with the pre-cast blocks and will vary between products; an example value may be 0.85.  
 
|Impervious surface fraction||This is the proportion of the total pavement taken up with the pre-cast blocks and will vary between products; an example value may be 0.85.  
Line 22: Line 23:
 
|Permeability (mm/hr)||This is the permeability of the joint material in block systems. Where the permeability of the bulk surface is measured and known instead, the impervious fraction can be adjusted to model a block surface as continuously permeable instead.   
 
|Permeability (mm/hr)||This is the permeability of the joint material in block systems. Where the permeability of the bulk surface is measured and known instead, the impervious fraction can be adjusted to model a block surface as continuously permeable instead.   
 
|-
 
|-
|Clogging factor||?
+
|[[Clogging]] factor||0.5 to model a matured system?
 
|-
 
|-
 
!colspan = "2" style="background: darkcyan; color: white; align = center"|Soil (Bedding layer?)
 
!colspan = "2" style="background: darkcyan; color: white; align = center"|Soil (Bedding layer?)
Line 28: Line 29:
 
|Thickness (mm)||Depth of bedding layer
 
|Thickness (mm)||Depth of bedding layer
 
|-
 
|-
|Porosity (fraction)||Suggested range 0.35 – 0.4 unless otherwise tested
+
|Porosity (fraction)||Suggested value 0.4 unless otherwise tested (see [[OPSS aggregates]])
 
|-
 
|-
 
|Field capacity (fraction)||Suggested range 0.10 - 0.12 for sand<ref name = SWMM/>
 
|Field capacity (fraction)||Suggested range 0.10 - 0.12 for sand<ref name = SWMM/>
Line 44: Line 45:
 
|Thickness (mm)||Depth of all aggregate bases
 
|Thickness (mm)||Depth of all aggregate bases
 
|-
 
|-
|Void ratio||Suggest range 0.35 – 0.4 unless otherwise tested
+
|Void ratio||Suggested value 0.4 unless otherwise tested
 
|-
 
|-
 
|Seepage rate (mm/hr)||Infiltration rate of native soil  
 
|Seepage rate (mm/hr)||Infiltration rate of native soil  
 
|-
 
|-
|Clogging factor||?
+
|Clogging factor||0.5 to model a matured system?
 
|-
 
|-
|Design drawdown time (hrs)||Recommend 48 hours?
+
|Design drawdown time (hrs)||Maybe 72 or 96 hours? See [[Drainage time]]
 
|-
 
|-
 
!colspan = "2" style="background: darkcyan; color: white; align = center"|Drain (underdrain)
 
!colspan = "2" style="background: darkcyan; color: white; align = center"|Drain (underdrain)
Line 58: Line 59:
 
|Flow exponent||Suggested value 1
 
|Flow exponent||Suggested value 1
 
|-
 
|-
|Offset height||This is the height from the base of the cell to the height at which the drain discharges. In some designs this may be the height of the perforated pipe within the storage layer. In other designs this height is adjusted by creating an upturn in the discharge pipe. [[Permeable paving]]
+
|Offset height||This is the height from the base of the cell to the height at which the drain discharges. In some designs this may be the height of the perforated pipe within the storage layer. In other designs this height is adjusted by creating an upturn in the discharge pipe. [[Permeable pavements]]
 
|}
 
|}
 
''<references/>''
 
''<references/>''
 
[[category: modeling]]
 
[[category: modeling]]

Latest revision as of 19:02, 6 August 2020

TTT.png

Permeable pavements is found within the LID toolbox
Surface
Berm height (mm) This is the height of the curb which constrains the overland sheet flow of water. Where curb cuts or other outlet exists at the lowest point of the pavement, the suggested value is 0.
Surface roughness (Manning’s n) Lower numbers indicate less surface obstruction and result in faster flow.

Suggested range for pavement 0.01 – 0.02 [1]

Surface slope (%) Typically between 1 – 4% (>2% recommended Effective grading)
Pavement
Thickness (mm) This is the thickness of just the pre-cast blocks (or depth of asphalt/concrete poured in place).
Void ratio This most commonly refers to the jointing material used between precast blocks. Suggest 0.4 unless otherwise tested. Where a pervious product is poured in place, an appropriate figure should be obtained from the manufacturer.
Impervious surface fraction This is the proportion of the total pavement taken up with the pre-cast blocks and will vary between products; an example value may be 0.85.

Where a pervious product is poured in place, this value will be 0.

Permeability (mm/hr) This is the permeability of the joint material in block systems. Where the permeability of the bulk surface is measured and known instead, the impervious fraction can be adjusted to model a block surface as continuously permeable instead.
Clogging factor 0.5 to model a matured system?
Soil (Bedding layer?)
Thickness (mm) Depth of bedding layer
Porosity (fraction) Suggested value 0.4 unless otherwise tested (see OPSS aggregates)
Field capacity (fraction) Suggested range 0.10 - 0.12 for sand[1]
Wilting point (fraction) Suggested value 0.03 for sand[1]
Conductivity (mm/hr) Suggested range 100 – 250 mm/hr for sand
Conductivity slope Suggested value 45 for sand [1]
Suction head (mm) Suggested value 50 for sand [1]
Storage
Thickness (mm) Depth of all aggregate bases
Void ratio Suggested value 0.4 unless otherwise tested
Seepage rate (mm/hr) Infiltration rate of native soil
Clogging factor 0.5 to model a matured system?
Design drawdown time (hrs) Maybe 72 or 96 hours? See Drainage time
Drain (underdrain)
Flow coefficient Suggested value 1
Flow exponent Suggested value 1
Offset height This is the height from the base of the cell to the height at which the drain discharges. In some designs this may be the height of the perforated pipe within the storage layer. In other designs this height is adjusted by creating an upturn in the discharge pipe. Permeable pavements
  1. 1.0 1.1 1.2 1.3 1.4 Oregon State Univ., Corvallis. Dept. of Civil, Construction and Environmental Engineering.; Environmental Protection Agency, Cincinnati ONRMRL. Storm Water Management Model Reference Manual Volume I Hydrology (Revised). 2016:233. https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P100NYRA.txt Accessed August 23, 2017.