[[File:Routing.png|thumb|Conceptual diagram of the excess routing alternatives: On the left, excess flow leaves the cell via an overflow; on the right, excess flow is diverted so that only the design volume enters the cell.]]
 
[[File:Routing.png|thumb|Conceptual diagram of the excess routing alternatives: On the left, excess flow leaves the cell via an overflow; on the right, excess flow is diverted so that only the design volume enters the cell.]]
[[File:BeehiveGrate.jpeg|thumb|Domed, metal overflow/outlet grate<br> Photo credit:Aaron Volkening]]
+
===Routing===
 
+
*Infiltration facilities can be designed to be inline or offline from the drainage system. See [[Inlets]]
==Routing==
  −
*Infiltration facilities can be designed to be inline or offline from the drainage system.
   
*Inline facilities accept all of the flow from a drainage area and convey larger event flows through an overflow outlet. The overflow must be sized to safely convey larger storm events out of the facility.  
 
*Inline facilities accept all of the flow from a drainage area and convey larger event flows through an overflow outlet. The overflow must be sized to safely convey larger storm events out of the facility.  
:The invert of the overflow should be placed at the maximum water surface elevation of the bioretention area, (typically 150 - 250 mm above the surface).  
+
 +
*The overflow must be situated at the far end of the facility to prevent any localised ponding to cause bypassing of the infiltration facility.  
 
*Offline facilities use flow splitters or bypass channels that only allow the required water quality storage volume to enter the facility.  
 
*Offline facilities use flow splitters or bypass channels that only allow the required water quality storage volume to enter the facility.  
:Higher flows are diverted and do not enter the infiltration practice. A pipe can by used for this, but a weir or [[curb cuts|curb cut]] minimizes clogging and reduces the maintenance frequency.
+
:Higher flows are diverted and do not enter the infiltration practice. A pipe can by used for this, but a [[weir]] or [[curb cuts|curb cut]] minimizes clogging and reduces the maintenance frequency.
 +
 
 +
===Overflow elevation===
 +
The invert of the overflow should be placed at the maximum water surface elevation of the practice. i.e. the maximum ponding depth.
 +
A good starting point is around 300 mm over the surface of the practice. However, consideration should be given to public safety and drainage time|time for the ponded water to drain.
 +
See [[Bioretention: Sizing#Additional step for system without underdrain|Bioretention]] and [[Stormwater planters]]
 +
 
 +
===Freeboard===
 +
{{:freeboard}}
   −
==Options==
+
===Options===
 +
Metal grates are recommended (over plastic) in all situations.
    
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 25: Line 33:  
|  
 
|  
 
| x
 
| x
|
  −
|-
  −
| Plastic grate
  −
|
  −
| x
  −
|
  −
|-
  −
| Metal grate
  −
| x
  −
|
   
|  
 
|  
 
|-
 
|-
Line 47: Line 45:  
| x
 
| x
 
|-
 
|-
| Curb cut
+
| [[Curb cut]]
 
| x
 
| x
 
| x
 
| x
 
| x
 
| x
 
|}
 
|}
 +
 +