Difference between revisions of "Site considerations"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
m
m
Line 15: Line 15:
 
!Wellhead protection area<ref>|Time-of-travel within wellhead protection areas</ref>
 
!Wellhead protection area<ref>|Time-of-travel within wellhead protection areas</ref>
 
|-
 
|-
|'''Rain Barrel'''
+
|'''[[Rain barrels|Rain Barrel]'''
 
|Not applicable
 
|Not applicable
 
||5 to 50 m<sup>2</sup>||Not applicable||1||0||NA||Yes||None||No||None
 
||5 to 50 m<sup>2</sup>||Not applicable||1||0||NA||Yes||None||No||None
 
|-
 
|-
|'''Cistern'''
+
|'''[[rainwater harvesting|Cistern]]'''
 
|Not applicable
 
|Not applicable
 
|1:1||Not applicable||0||0||0||Yes||None||No||None
 
|1:1||Not applicable||0||0||0||Yes||None||No||None
 
|-
 
|-
|'''Roof downspout disconnection'''
+
|'''[[Downspout disconnection|Roof downspout disconnection]]'''
 
|Not applicable
 
|Not applicable
 
|5 to 100 m<sup>2</sup>||Amend if < 15 mm/hr||0.5||5 to 20||1 to 5||Yes||Building Foundation||No||None
 
|5 to 100 m<sup>2</sup>||Amend if < 15 mm/hr||0.5||5 to 20||1 to 5||Yes||Building Foundation||No||None
Line 31: Line 31:
 
|5:1 to 20:1||Not a constraint||1 to 2||0 to 1||<15 %||No||4m- Building Foundation<br>Underground Utilities, Trees,<br>Drinking Water Wellhead<br>Protection Areas||Yes||2 yr
 
|5:1 to 20:1||Not a constraint||1 to 2||0 to 1||<15 %||No||4m- Building Foundation<br>Underground Utilities, Trees,<br>Drinking Water Wellhead<br>Protection Areas||Yes||2 yr
 
|-
 
|-
|'''Bioretention'''
+
|'''[[Bioretention]]'''
 
|1
 
|1
|5:1 to 15:1||Underdrain recommended<br>if < 15 mm/hr||1 to 2||5 to 10||0 to 2||No||4m- Building Foundation<br>Underground Utilities, Trees,<br>Drinking Water Wellhead<br>Protection Areas||Yes||2 yr
+
|5:1 to 15:1||[[Underdrain]] recommended<br>if < 15 mm/hr||1 to 2||5 to 10||0 to 2||No||4m- Building Foundation<br>Underground Utilities, Trees,<br>Drinking Water Wellhead<br>Protection Areas||Yes||2 yr
 
|-
 
|-
|'''Stormwater planters'''
+
|'''[[Stormwater planters]]'''
 
|Not applicable
 
|Not applicable
 
|5:1||Not applicable||1 to 2||2 to 5||0 to 2||Yes||Building Foundation, Trees||No||None
 
|5:1||Not applicable||1 to 2||2 to 5||0 to 2||Yes||Building Foundation, Trees||No||None
 
|-
 
|-
|'''Vegetated filter strip'''
+
|'''[[Vegetated filter strip]]'''
 
|1
 
|1
 
|5:1||Amend if < 15 mm/hr||0 to 1||15 to 20||1 to 5||No||None||No||None
 
|5:1||Amend if < 15 mm/hr||0 to 1||15 to 20||1 to 5||No||None||No||None
 
|-
 
|-
|'''Permeable pavement'''
+
|'''[[Permeable pavement]]'''
 
|1
 
|1
 
|1:1 to 1.2:1||Underdrain recoomended <br> if < 15 mm/hr||0.5 to 1||0||1 to 5||No||4m-Underground Utilities<br>Drinking Water Wellhead<br>Protection Areas||Yes||2 Yr
 
|1:1 to 1.2:1||Underdrain recoomended <br> if < 15 mm/hr||0.5 to 1||0||1 to 5||No||4m-Underground Utilities<br>Drinking Water Wellhead<br>Protection Areas||Yes||2 Yr
 
|-
 
|-
|'''Enhanced grass swale (has checkdams)'''
+
|'''[[Enhanced grass swale]](has checkdams)'''
 
|1
 
|1
 
|5:1 to 10:1||Not applicable||1 to 3||5 to 15||0.5 to 6||No||4m- Building Foundation<br>Underground Utilities||Yes||None
 
|5:1 to 10:1||Not applicable||1 to 3||5 to 15||0.5 to 6||No||4m- Building Foundation<br>Underground Utilities||Yes||None
 
|-
 
|-
|'''Dry swale (Bioswale)'''
+
|'''[[Dry swale]] (Bioswale)'''
 
|1
 
|1
 
|5:1 to 15:1||Underdrain recommended <br> if < 15 mm/hr||1 to 3||5 to 10||0.5 to 6||No||4m (3m if impermeable liner<br>is used)Building foundation,<br> Underground utilities, drinking<br>water wellhead protection areas||Yes||2 Yr
 
|5:1 to 15:1||Underdrain recommended <br> if < 15 mm/hr||1 to 3||5 to 10||0.5 to 6||No||4m (3m if impermeable liner<br>is used)Building foundation,<br> Underground utilities, drinking<br>water wellhead protection areas||Yes||2 Yr
 
|-
 
|-
|'''Perforated pipe system'''
+
|'''[[Perforated pipe system]]'''
 
|1
 
|1
 
|5:1 to 10:1||Not a constraint||1 to 3||0||< 15%||No||4m- Building Foundation<br>Underground Utilities, Trees,<br>Drinking Water Wellhead<br>Protection Areas||Yes||2 Yr
 
|5:1 to 10:1||Not a constraint||1 to 3||0||< 15%||No||4m- Building Foundation<br>Underground Utilities, Trees,<br>Drinking Water Wellhead<br>Protection Areas||Yes||2 Yr
 
|}
 
|}

Revision as of 14:18, 13 February 2019

Installations type Depth to high water or bedrock (m)[1] Typical ratio of
Impervious drainage area
to Treatment Facility Area
Native soil infiltration rate (mm/hr)[2] Head (m)[3] Space % [4] Slope % [5] Applicable in pollution hotspots [6] Set backs Water table separation[7] Wellhead protection area[8]
[[Rain barrels|Rain Barrel] Not applicable 5 to 50 m2 Not applicable 1 0 NA Yes None No None
Cistern Not applicable 1:1 Not applicable 0 0 0 Yes None No None
Roof downspout disconnection Not applicable 5 to 100 m2 Amend if < 15 mm/hr 0.5 5 to 20 1 to 5 Yes Building Foundation No None
Soakaway, infiltration trench or chamber 1 5:1 to 20:1 Not a constraint 1 to 2 0 to 1 <15 % No 4m- Building Foundation
Underground Utilities, Trees,
Drinking Water Wellhead
Protection Areas
Yes 2 yr
Bioretention 1 5:1 to 15:1 Underdrain recommended
if < 15 mm/hr
1 to 2 5 to 10 0 to 2 No 4m- Building Foundation
Underground Utilities, Trees,
Drinking Water Wellhead
Protection Areas
Yes 2 yr
Stormwater planters Not applicable 5:1 Not applicable 1 to 2 2 to 5 0 to 2 Yes Building Foundation, Trees No None
Vegetated filter strip 1 5:1 Amend if < 15 mm/hr 0 to 1 15 to 20 1 to 5 No None No None
Permeable pavement 1 1:1 to 1.2:1 Underdrain recoomended
if < 15 mm/hr
0.5 to 1 0 1 to 5 No 4m-Underground Utilities
Drinking Water Wellhead
Protection Areas
Yes 2 Yr
Enhanced grass swale(has checkdams) 1 5:1 to 10:1 Not applicable 1 to 3 5 to 15 0.5 to 6 No 4m- Building Foundation
Underground Utilities
Yes None
Dry swale (Bioswale) 1 5:1 to 15:1 Underdrain recommended
if < 15 mm/hr
1 to 3 5 to 10 0.5 to 6 No 4m (3m if impermeable liner
is used)Building foundation,
Underground utilities, drinking
water wellhead protection areas
Yes 2 Yr
Perforated pipe system 1 5:1 to 10:1 Not a constraint 1 to 3 0 < 15% No 4m- Building Foundation
Underground Utilities, Trees,
Drinking Water Wellhead
Protection Areas
Yes 2 Yr
  1. Minimum depth between the base of the facility and the elevation of the seasonally high water table or top of bedrock
  2. Infiltration rate estimates based on measurements of hydraulic conductivity under field saturated conditions at the proposed location and depth of the practice
  3. Vertical distance between the inlet and outlet of the LID practice
  4. Percent of open pervious land on the site that is required for the LID practice
  5. Slope at the LID practice location
  6. Suitable in pollution hot spots or runoff source areas where land uses or activities have the potential to generate highly contaminated runoff
  7. Must have adequate separation from the seasonally high water table or top of bedrock elevation
  8. |Time-of-travel within wellhead protection areas