Difference between revisions of "LID opportunities in park lands"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 1: Line 1:
 
{{TOClimit|2}}
 
{{TOClimit|2}}
 
[[File:Example.jpg|thumb|The bioretention area installed at O’Connor Park in Mississauga is part of a stormwater management system that treats parking lot runoff prior to discharging to a local wetland. (Source: CVC)]]
 
[[File:Example.jpg|thumb|The bioretention area installed at O’Connor Park in Mississauga is part of a stormwater management system that treats parking lot runoff prior to discharging to a local wetland. (Source: CVC)]]
[[File:Example1.jpg|thumb|Urban parkettes may look small, but they have the potential to treat a large surface area of road. Typical ratios of impervious drainage area to bioretention range from 5:1 to 15:1. (Source: CVC)]]
+
[[File:Example1.jpg|thumb|Urban parkettes may look small, but they have the potential to treat a large surface area of road. Typical ratios of impervious drainage area to a bioretention range from 5:1 to 15:1. (Source: CVC)]]
 
[[File:Example3.jpg|thumb|The road surface (left) contributes significantly more stormwater pollutants than the parkland area (right). To achieve maximum watershed benefit a designer could consider accepting runoff from this external area. (Source: CVC)]]
 
[[File:Example3.jpg|thumb|The road surface (left) contributes significantly more stormwater pollutants than the parkland area (right). To achieve maximum watershed benefit a designer could consider accepting runoff from this external area. (Source: CVC)]]
 
[[File:Example6.jpg|thumb|Source areas within a typical park]]
 
[[File:Example6.jpg|thumb|Source areas within a typical park]]
  
Parks range from simple parcels of municipal property to complex outdoor recreational facilities that include parking, sidewalks, trails, sports fields, field houses, operations facilities, and washrooms. Each distinct area of your site can be a source for runoff (referred to as a ‘source area’). These areas should be targeted when introducing LID in your park.
+
Parks range from simple parcels of municipal property to complex outdoor recreational facilities that include parking, sidewalks, trails, sports fields, field houses, operations facilities and washrooms. Each distinct area of your site can be a source for runoff (referred to as a ‘source area’). Target these areas when introducing LID in your park.
  
 
===Targeting hard surfaces===
 
===Targeting hard surfaces===
Hard surfaces like parking lots and internal driveways are the most obvious areas to target for both stormwater quality and water balance improvements. These features produce more runoff than any other area on your site. Water quality of runoff from parking lots and driveways is typically more polluted than other source areas. Common water quality concerns include sand and salt from [[winter]] de-icing operations, and hydrocarbons (gasoline) and metals from vehicle breakdowns.
+
Hard surfaces like parking lots and internal driveways are the most obvious targets for both stormwater quality and water balance improvements. These features produce more runoff than any other area on your site. Runoff from parking lots and driveways is typically more polluted than other source areas. Common water quality concerns include sand and salt from [[winter]] de-icing operations, hydrocarbons (gasoline) and heavy metals from vehicle breakdowns.
  
Runoff from vegetated areas of parks will be relatively clean and more closely match the natural water balance. On municipal park properties, hard surfaces are usually
+
Runoff from vegetated areas of parks will be relatively clean and more closely matches the natural water balance. On municipal park properties, hard surfaces are usually
located adjacent to pervious areas such as lawns, gardens or naturalized areas. This makes an ideal location for a LID retrofit. Where grading allows, you can construct [[bioswales]] and [[bioretention]] areas in these green areas to pre-treat water prior to infiltration.
+
located adjacent to pervious areas such as lawns, gardens or naturalized areas. This makes parks an ideal location for a LID retrofit. Where grading allows, you can construct [[bioswales]] and [[bioretention]] areas in these green areas to pre-treat water prior to infiltration.
  
You can also design parking surfaces and internal roadways as infiltration systems using permeable pavement. This retrofit strategy can be combined with other LID practices. Apathway paved with [[permeable paving]] is another LID option for your park. They will reduce runoff volumes and encourage on-site infiltration. [[Exfiltration trenches]] are a viable option on many parks sites as well. They can be an alternative to conventional conveyance systems such as storm sewers. They encourage infiltration from hard surfaces and can be used to convey water to other LID features.
+
You can also design parking surfaces and internal roadways as infiltration systems using permeable pavement. This retrofit strategy can be combined with other LID practices. Pathways paved with [[permeable paving]] are another LID option for your park. They reduce runoff volumes and encourage on-site infiltration. [[Exfiltration trenches]] are a viable option on many parks sites as well, as they provide an alternative to conventional conveyance systems (such as storm sewers). Permeable paving encourages infiltration from hard surfaces and can be used to convey water to other LID features.
 
   
 
   
 
===Accepting drainage from off-site areas===   
 
===Accepting drainage from off-site areas===   
  
 
Does municipally owned land drain into your retrofit site? If so, this is an opportunity to provide stormwater controls for these areas.
 
Does municipally owned land drain into your retrofit site? If so, this is an opportunity to provide stormwater controls for these areas.
Roads are the most common source of runoff from external properties into parks. Treating municipal road runoff in a park requires planning input from municipal roads department staff. For these projects, the team must understand how all roads activities, including winter maintenance and potential roadwork, will affect the operation of LID practices in the park.
+
Roads are the most common source of runoff from external properties into parks. Treating municipal road runoff in a park requires planning input from municipal roads department staff. For these projects, the team must understand how all road activities, including winter maintenance and potential roadwork, will affect the operation of LID practices in the park.
  
 
===Inter-municipal transfer of funds===
 
===Inter-municipal transfer of funds===
Integrating LID practices into the municipal stormwater management framework may change how municipal funds are managed. Traditional stormwater management maintenance resources and funds may have to be transferred to a more landscape-based stormwater management maintenance program. Instead of infrequent but expensive stormwater management pond sediment removal operations, time and resources will be spent on more frequent but inexpensive maintenance projects including pruning and weeding bioretention practices or sweeping permeable pavement.
+
Integrating LID practices into the municipal stormwater management framework may require a change in how municipal funds are managed. Traditional stormwater management maintenance resources and funds may have to be transferred to a more landscape-based stormwater management maintenance program. Instead of infrequent but expensive stormwater management pond sediment removal operations, time and resources would be spent on more frequent but inexpensive maintenance projects, including pruning and weeding bioretention practices or sweeping permeable pavement.
Municipalities generally have the required staff and infrastructure within departments (e.g. arborist and horticulturalists in parks departments) to manage the maintenance of LID measures; however, funding this maintenance may require a transfer of funding and additional training.  
+
Municipalities generally have the required staff and infrastructure within departments (e.g. arborists and horticulturalists in parks departments) to manage the maintenance of LID measures. However, funding this maintenance may require a transfer of funding and additional training.  
The federal Gas Tax Fund (GTF) is another funding option for funding LID retrofits. This is a federal transfer that provides long term funding for municipalities to build and revitalize public infrastructure. Up to 30% of municipalities yearly GTF allotment can be used towards stormwater management.
+
The federal Gas Tax Fund (GTF) is another funding option for funding LID retrofits. This federal transfer provides long-term funding for municipalities to build and revitalize public infrastructure. Up to 30% of a municipality's yearly GTF allotment can be used for stormwater management.
  
 
===Source Areas===   
 
===Source Areas===   
The LID option that best fits your site will depend what types of source areas are present. Source areas may include:
+
The best LID option for your site will depend what types of source areas are present. Source areas may include:
 
* Active use areas
 
* Active use areas
 
* Passive use areas
 
* Passive use areas
Line 62: Line 62:
  
 
==Making it happen: Approaches to getting LID into parks==
 
==Making it happen: Approaches to getting LID into parks==
The scale of your LID project will largely determine how you will proceed. This guide provides two tiers of LID park retrofit projects. You can usually complete small-scale LID projects with in-house expertise and resources. Large-scale projects will require external support from consultants and contractors.
+
The scale of your LID project will largely determine how to proceed. While you can usually complete small-scale LID projects with in-house expertise and resources, large-scale projects require external support from consultants and contractors.
  
 
===Small-scale projects===  
 
===Small-scale projects===  
 
[[File:Example4.jpg|thumb|A [[no-mow]] zone is a landscape alternative that does not require construction activities. (Source: Aquafor Beech)]]
 
[[File:Example4.jpg|thumb|A [[no-mow]] zone is a landscape alternative that does not require construction activities. (Source: Aquafor Beech)]]
  
Starting with small-scale projects is a good strategy to increase public interest in LID practices, gauge municipal support, and gain experience. Small-scale projects include retrofitting your parks site with landscape alternatives or [[rain barrels]], or using pollution prevention strategies and practices.
+
Starting with small-scale projects is a good strategy to increase public interest in LID practices, gauge municipal support and gain experience. Small-scale projects include retrofitting your park with landscape alternatives, [[rain barrels]], or by using pollution prevention strategies and practices.
  
Small-scale projects require fewer resources and a smaller project budget because:
+
Small-scale projects require fewer resources and a smaller project budget:
 
* They do not require integration into capital works projects
 
* They do not require integration into capital works projects
 
* Engineering consultants are not required
 
* Engineering consultants are not required
Line 76: Line 76:
 
* Consultation with the public is limited
 
* Consultation with the public is limited
  
Due to the less significant financial commitment, it can be easier to build colleague and supervisor support for small-scale projects. Small-scale projects like landscape alternatives and pollution prevention may not be easily identified as LID practices by the public. Your project team should consider establishing educational signage to inform the public.
+
Due to less financial commitment, it can be easier to build colleague support and to gain supervisor approval for small-scale projects. However, small-scale projects like landscape alternatives and pollution prevention may not be easily identified as LID practices by the public. Your project team should consider establishing educational signage to inform the public.
  
 
===Large-scale projects===
 
===Large-scale projects===
 
[[File:Example5.jpg|thumb|When installing new parks equipment, consider whether the LID practices can be integrated into the design. Here a bioswale has been built into the landscape between a playground and sidewalk. (Source: CVC)]]
 
[[File:Example5.jpg|thumb|When installing new parks equipment, consider whether the LID practices can be integrated into the design. Here a bioswale has been built into the landscape between a playground and sidewalk. (Source: CVC)]]
  
Large-scale projects require significantly more effort, budget, and staff than small-scale projects. Large-scale LID projects include:
+
Large-scale projects require significantly more effort, budget, and staff than small-scale projects. Large-scale LID practices include:
 
* Bioretention
 
* Bioretention
 
* Enhanced grass swales
 
* Enhanced grass swales
Line 96: Line 96:
 
Before starting a large-scale retrofit project, consider the following distinctions that set these retrofits apart from small-scale projects.
 
Before starting a large-scale retrofit project, consider the following distinctions that set these retrofits apart from small-scale projects.
 
====Integration with capital works programs====
 
====Integration with capital works programs====
Most large-scale LID retrofits must function with existing site infrastructure, such as storm sewers, catch basins, and pavement systems. The construction of large-scale
+
Most large-scale LID retrofits must function with existing site infrastructure, such as storm sewers, catch basins and pavement systems. Construting large-scale
LID practices often requires these systems to be removed, exposed, or replaced. The best time for this type of project to occur is when an infrastructure replacement or rehabilitation project is already planned. For example, installing bioretention, infiltration chambers, or permeable pavement in a parking lot requires removal of existing pavement. Budget and resources set aside for parking lot replacement could be transferred to a retrofit project that includes replacement of this infrastructure.
+
LID practices often requires these systems to be removed, exposed or replaced. Planned infrastructure replacement or rehabilitation projects provide opportunities for implementing LID practices. For example, if a planned project requires removing existing pavement, infiltration chambers, permeable pavement or bioretention can be incorporated. Budget and resources already set aside for infrastructure projects can be set aside for a retrofit project including replacement existing infrastructure.
  
 
====Involvement of consultants and contractors====
 
====Involvement of consultants and contractors====
Line 105: Line 105:
  
 
====More intensive public consultation====
 
====More intensive public consultation====
Stakeholders must be closely involved in the retrofit process for large-scale LID projects. These projects have longer construction windows, may have significant impacts on long term public use patterns of the park, and will cost significantly more taxpayer dollars. Gaining public insight in advance of LID implementation can
+
Stakeholders must be closely involved in the retrofit process for large-scale LID projects. These projects have longer construction windows, may have significant impacts on long term public use patterns of the park, and will have significantly higher costs. Gaining public insight in advance of LID implementation can
 
help address public concerns and information gaps, as well as identify public supporters and champions. Public consultation can help designers tailor the project to address community concerns and values.  
 
help address public concerns and information gaps, as well as identify public supporters and champions. Public consultation can help designers tailor the project to address community concerns and values.  
  
 
====External approvals====
 
====External approvals====
Large-scale park retrofits may require a variety of approvals at the municipal, watershed, provincial, and/or federal level. Since LID is still relatively new, you may encounter policies or bylaws that present barriers to LID retrofit projects. Alternatively, the municipality may have to enforce some policies and bylaws to facilitate the implementation of LID projects within parks.
+
Large-scale park retrofits may require a variety of approvals at the municipal, watershed, provincial and/or federal level. Since LID is still relatively new, you may encounter policies or bylaws that present barriers to LID retrofit projects. Alternatively, the municipality may have to enforce some policies and bylaws to facilitate the implementation of LID projects within parks.
  
 
[[Category:Planning]]
 
[[Category:Planning]]

Revision as of 17:40, 5 December 2017

The bioretention area installed at O’Connor Park in Mississauga is part of a stormwater management system that treats parking lot runoff prior to discharging to a local wetland. (Source: CVC)
Urban parkettes may look small, but they have the potential to treat a large surface area of road. Typical ratios of impervious drainage area to a bioretention range from 5:1 to 15:1. (Source: CVC)
The road surface (left) contributes significantly more stormwater pollutants than the parkland area (right). To achieve maximum watershed benefit a designer could consider accepting runoff from this external area. (Source: CVC)
Source areas within a typical park

Parks range from simple parcels of municipal property to complex outdoor recreational facilities that include parking, sidewalks, trails, sports fields, field houses, operations facilities and washrooms. Each distinct area of your site can be a source for runoff (referred to as a ‘source area’). Target these areas when introducing LID in your park.

Targeting hard surfaces[edit]

Hard surfaces like parking lots and internal driveways are the most obvious targets for both stormwater quality and water balance improvements. These features produce more runoff than any other area on your site. Runoff from parking lots and driveways is typically more polluted than other source areas. Common water quality concerns include sand and salt from winter de-icing operations, hydrocarbons (gasoline) and heavy metals from vehicle breakdowns.

Runoff from vegetated areas of parks will be relatively clean and more closely matches the natural water balance. On municipal park properties, hard surfaces are usually located adjacent to pervious areas such as lawns, gardens or naturalized areas. This makes parks an ideal location for a LID retrofit. Where grading allows, you can construct bioswales and bioretention areas in these green areas to pre-treat water prior to infiltration.

You can also design parking surfaces and internal roadways as infiltration systems using permeable pavement. This retrofit strategy can be combined with other LID practices. Pathways paved with permeable paving are another LID option for your park. They reduce runoff volumes and encourage on-site infiltration. Exfiltration trenches are a viable option on many parks sites as well, as they provide an alternative to conventional conveyance systems (such as storm sewers). Permeable paving encourages infiltration from hard surfaces and can be used to convey water to other LID features.

Accepting drainage from off-site areas[edit]

Does municipally owned land drain into your retrofit site? If so, this is an opportunity to provide stormwater controls for these areas. Roads are the most common source of runoff from external properties into parks. Treating municipal road runoff in a park requires planning input from municipal roads department staff. For these projects, the team must understand how all road activities, including winter maintenance and potential roadwork, will affect the operation of LID practices in the park.

Inter-municipal transfer of funds[edit]

Integrating LID practices into the municipal stormwater management framework may require a change in how municipal funds are managed. Traditional stormwater management maintenance resources and funds may have to be transferred to a more landscape-based stormwater management maintenance program. Instead of infrequent but expensive stormwater management pond sediment removal operations, time and resources would be spent on more frequent but inexpensive maintenance projects, including pruning and weeding bioretention practices or sweeping permeable pavement. Municipalities generally have the required staff and infrastructure within departments (e.g. arborists and horticulturalists in parks departments) to manage the maintenance of LID measures. However, funding this maintenance may require a transfer of funding and additional training. The federal Gas Tax Fund (GTF) is another funding option for funding LID retrofits. This federal transfer provides long-term funding for municipalities to build and revitalize public infrastructure. Up to 30% of a municipality's yearly GTF allotment can be used for stormwater management.

Source Areas[edit]

The best LID option for your site will depend what types of source areas are present. Source areas may include:

  • Active use areas
  • Passive use areas
  • Pedestrian walkways
  • Internal driveways
  • Parking lots

On park sites, pollution prevention is often associated with changes to operations and maintenance practices and has not been included in the table below. Options and implementation strategies for a few of these source areas will give you some ideas for your park site.

LID opportunities in parks
(** = Common, * = Possible, o = Unusual)
Source area Permeable paving Bioretention Enhanced grass swales Bioswales Infiltration trenches and chambers Exfiltration trenches Landscape alternatives Prefabricated modules
Active use area ** o * * ** * o o
Passive use area o ** ** ** ** ** ** **
Pedestrian walkway ** ** ** ** ** * * o
Internal driveway ** ** ** ** ** ** o *
Parking lot ** ** ** ** ** ** o **

Making it happen: Approaches to getting LID into parks[edit]

The scale of your LID project will largely determine how to proceed. While you can usually complete small-scale LID projects with in-house expertise and resources, large-scale projects require external support from consultants and contractors.

Small-scale projects[edit]

A no-mow zone is a landscape alternative that does not require construction activities. (Source: Aquafor Beech)

Starting with small-scale projects is a good strategy to increase public interest in LID practices, gauge municipal support and gain experience. Small-scale projects include retrofitting your park with landscape alternatives, rain barrels, or by using pollution prevention strategies and practices.

Small-scale projects require fewer resources and a smaller project budget:

  • They do not require integration into capital works projects
  • Engineering consultants are not required
  • Contractors may not be not required
  • External approvals are not required
  • Consultation with the public is limited

Due to less financial commitment, it can be easier to build colleague support and to gain supervisor approval for small-scale projects. However, small-scale projects like landscape alternatives and pollution prevention may not be easily identified as LID practices by the public. Your project team should consider establishing educational signage to inform the public.

Large-scale projects[edit]

When installing new parks equipment, consider whether the LID practices can be integrated into the design. Here a bioswale has been built into the landscape between a playground and sidewalk. (Source: CVC)

Large-scale projects require significantly more effort, budget, and staff than small-scale projects. Large-scale LID practices include:

  • Bioretention
  • Enhanced grass swales
  • Bioswales
  • Perforated pipe systems
  • Permeable pavement
  • Soakaways
  • Infiltration chambers
  • Rainwater harvesting
  • Prefabricated modules

Consider a large-scale project if your municipality or department would like to be a leader in sustainability. Large scale projects are often highly visible and attract more public attention. Large-scale projects may also be the only solution to site-specific challenges. For example, if the parking lot on your site does not have existing stormwater controls, small-scale projects are not likely to fully achieve compliance with water quality and quantity objectives. Consider using an infiltration chamber or bioswale project to meet those objectives.

Before starting a large-scale retrofit project, consider the following distinctions that set these retrofits apart from small-scale projects.

Integration with capital works programs[edit]

Most large-scale LID retrofits must function with existing site infrastructure, such as storm sewers, catch basins and pavement systems. Construting large-scale LID practices often requires these systems to be removed, exposed or replaced. Planned infrastructure replacement or rehabilitation projects provide opportunities for implementing LID practices. For example, if a planned project requires removing existing pavement, infiltration chambers, permeable pavement or bioretention can be incorporated. Budget and resources already set aside for infrastructure projects can be set aside for a retrofit project including replacement existing infrastructure.

Involvement of consultants and contractors[edit]

Consultants are required for large-scale retrofit projects, specifically for the final screening of options, pre-design, detailed design, tender and contract documents, construction supervision and administration, and assumption and verification. Site contractors are also required for large-scale LID retrofits.

Ideally, contractors should be pre-qualified based on previous experience with similar LID projects.

More intensive public consultation[edit]

Stakeholders must be closely involved in the retrofit process for large-scale LID projects. These projects have longer construction windows, may have significant impacts on long term public use patterns of the park, and will have significantly higher costs. Gaining public insight in advance of LID implementation can help address public concerns and information gaps, as well as identify public supporters and champions. Public consultation can help designers tailor the project to address community concerns and values.

External approvals[edit]

Large-scale park retrofits may require a variety of approvals at the municipal, watershed, provincial and/or federal level. Since LID is still relatively new, you may encounter policies or bylaws that present barriers to LID retrofit projects. Alternatively, the municipality may have to enforce some policies and bylaws to facilitate the implementation of LID projects within parks.