Difference between revisions of "Downspout disconnection"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 14: Line 14:
 
</panelSuccess>
 
</panelSuccess>
 
</div>
 
</div>
 +
 +
<div class="col-md-4">
 +
<gallery mode="packed" widths=300px heights=300px>
 +
David Elkin downspout disconnection to constructed stream channel.jpg| Downspout routed to [[Infiltration trench|infiltration trench]].
 +
</gallery>
 +
</div>
 +
<div class="col-md-12">
 
----
 
----
<div class="col-md-12">
 
 
<table class="table table-hover table-condensed table-bordered">
 
<table class="table table-hover table-condensed table-bordered">
 
<td class="text-center"><i class="fa fa-envelope-open-o"></i>&nbsp;&nbsp;[[Special:SpecialContact|<strong>SEND US YOUR FEEDBACK ABOUT THIS PAGE</strong>]]</td>
 
<td class="text-center"><i class="fa fa-envelope-open-o"></i>&nbsp;&nbsp;[[Special:SpecialContact|<strong>SEND US YOUR FEEDBACK ABOUT THIS PAGE</strong>]]</td>
 
</table>
 
</table>

Revision as of 19:12, 6 June 2017

Downspout disconnection programs are common in many older urban centers. They require that residents retroactively disconnect their downspouts from the municipal sewer system. This is due to older sewer systems being undersized for the combined flow of sanitary waste and stormwater.

New projects should consider remaining independent of municipal storm sewers from the outset. To prevent flooding and achieve stormwater control, widespread use of small, site scale technologies such as downspout disconnection can reduce the size of shared LID installations.

The Ontario Building Code requires that:
"Where downspouts are provided and are not connected to a sewer, extensions shall be provided to carry rainwater away from the building in a manner that will prevent soil erosion."[1]

<panelSuccess> Recommended strategies to receive downspout runoff include:

</panelSuccess>