(Created page with "Check dams usually consist of crushed rock gabions, or pre-treated timber up to 0.6 m in height. Rocks used in check dams should have median diameter 25-75 mm. The spacing of...")
 
Line 1: Line 1:
Check dams usually consist of crushed rock gabions, or pre-treated timber up to 0.6 m in height. Rocks used in check dams should have median diameter 25-75 mm.  
+
{plain list|1=
The spacing of dams should not exceed the horizontal distance from the toe of the upstream dam to the same elevation on the downstream dam.   
+
*Check dams usually consist of crushed rock gabions, or pre-treated timber up to 0.6 m in height.  
Where check dams are used, the maximum design depth of ponded water must be 0.5 m.
+
*Rocks used in check dams should have median diameter 25-75 mm.  
 +
*The spacing of dams should not exceed the horizontal distance from the toe of the upstream dam to the same elevation on the downstream dam.   
 +
*Where check dams are used, the maximum design depth of ponded water must be 0.5 m.}

Revision as of 01:11, 19 September 2017

{plain list|1=

  • Check dams usually consist of crushed rock gabions, or pre-treated timber up to 0.6 m in height.
  • Rocks used in check dams should have median diameter 25-75 mm.
  • The spacing of dams should not exceed the horizontal distance from the toe of the upstream dam to the same elevation on the downstream dam.
  • Where check dams are used, the maximum design depth of ponded water must be 0.5 m.}