*Check dams usually consist of crushed rock gabions, or pre-treated timber up to 0.6 m in height.  
 
*Check dams usually consist of crushed rock gabions, or pre-treated timber up to 0.6 m in height.  
 
*Rocks used in check dams should have median diameter 25-75 mm.  
 
*Rocks used in check dams should have median diameter 25-75 mm.  
 
*The spacing of dams should not exceed the horizontal distance from the toe of the upstream dam to the same elevation on the downstream dam.   
 
*The spacing of dams should not exceed the horizontal distance from the toe of the upstream dam to the same elevation on the downstream dam.   
 
*Where check dams are used, the maximum design depth of ponded water must be 0.5 m.}}
 
*Where check dams are used, the maximum design depth of ponded water must be 0.5 m.}}

Revision as of 01:13, 19 September 2017

  • Check damsStructures constructed of a non-erosive material, such as suitably sized aggregate, wood, gabions, riprap, or concrete; used to slow runoff water. Can be employed in practices such as bioswales and enhanced grass swales. usually consist of crushed rock gabions, or pre-treated timber up to 0.6 m in height.
  • Rocks used in check damsStructures constructed of a non-erosive material, such as suitably sized aggregate, wood, gabions, riprap, or concrete; used to slow runoff water. Can be employed in practices such as bioswales and enhanced grass swales. should have median diameter 25-75 mm.
  • The spacing of dams should not exceed the horizontal distance from the toe of the upstream dam to the same elevation on the downstream dam.
  • Where check damsStructures constructed of a non-erosive material, such as suitably sized aggregate, wood, gabions, riprap, or concrete; used to slow runoff water. Can be employed in practices such as bioswales and enhanced grass swales. are used, the maximum design depth of ponded water must be 0.5 m.