Changes

Jump to navigation Jump to search
m
Line 53: Line 53:  
! 3
 
! 3
 
|-
 
|-
|Catchment < 100 m²<ref>Ballard, B. W., Wilson, S., Udale-Clarke, H., Illman, S., Scott, T., Ashley, R., & Kellagher, R. (2015). The SuDS Manual. London.</ref>
+
|Catchment < 100 m²
|Catchment > 100 m²
+
|Catchment > 100 m²<ref>Ballard, B. W., Wilson, S., Udale-Clarke, H., Illman, S., Scott, T., Ashley, R., & Kellagher, R. (2015). The SuDS Manual. London.</ref>
 
|-
 
|-
|
+
|Permeameter or Percolation test on site
 +
|Double ring infiltrometer test on site, or Grain size used <ref>San Francisco Public Utilities Commission. (2017). Determination of Design Infiltration Rates for the Sizing of Infiltration‐based Green Infrastructure Facilities. Retrieved from http://sfwater.org/modules/showdocument.aspx?documentid=9681</ref> 
 +
|}
 +
----
8,255

edits

Navigation menu