Changes

Jump to navigation Jump to search
m
no edit summary
Line 1: Line 1: −
In Ontario the vertical separation between a practice and the water table or bedrock is frequently cited as 1 meter.  
+
In Ontario the required vertical separation between a practice and the water table or bedrock is frequently cited as 1 meter.  
This comes from the  
+
This comes from the [https://www.ontario.ca/document/stormwater-management-planning-and-design-manual-0 2003 Stormwater Management Planning and Design Manual].
    
''"The depth to bedrock should be greater than or equal to 1 metre below the bottom of the [[exfiltration trenches|perforated pipe]] storage media to ensure adequate drainage/hydraulic potential"<ref name=MOE2003>https://www.ontario.ca/document/stormwater-management-planning-and-design-manual/stormwater-management-plan-and-swmp-design</ref>''
 
''"The depth to bedrock should be greater than or equal to 1 metre below the bottom of the [[exfiltration trenches|perforated pipe]] storage media to ensure adequate drainage/hydraulic potential"<ref name=MOE2003>https://www.ontario.ca/document/stormwater-management-planning-and-design-manual/stormwater-management-plan-and-swmp-design</ref>''
Line 7: Line 7:     
Both of these considerations are equally relevant to the [[underdrain]] of any structural BMP.   
 
Both of these considerations are equally relevant to the [[underdrain]] of any structural BMP.   
 +
---
    
Other relevant  
 
Other relevant  
8,255

edits

Navigation menu