Difference between revisions of "Rainwater harvesting: Sizing and modeling"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 1: Line 1:
<html>
 
<head>
 
<body>
 
<img src = "http://mediawiki.trca.info/images/thumb/9/9d/Cistern_Size.png/800px-Cistern_Size.png" alt="schematic diagram shows rainwater and top-up as inputs to rainwater harvesting cistern, and outputs are irrigation, other non-potable uses, and overflow" width = 200>
 
</body>
 
</html>
 
  
[[file:Cistern_Size.png | thumb |Caption]]
+
[[file:Cistern_Size.png | 200 px | Frame |Caption]]
 
<h4>Rapid</h4>
 
<h4>Rapid</h4>
 
Cistern size can be estimated by multiplying the depth
 
Cistern size can be estimated by multiplying the depth

Revision as of 19:23, 2 June 2017

Caption

Rapid

Cistern size can be estimated by multiplying the depth

Interactive Sizing Tool[edit]

The Sustainable Technologies Evaluation Program have produced a rainwater harvesting design and costing tool specific to Ontario. The tool is in a simple to use Excel format and is free to download.


<panelInfo> RWH Sizing Tool </panelInfo>

The Treatment Train Tool[edit]

Once the size of cistern has been determined, it can easily be modelled in many open source and proprietary applications.

In addition to the cistern size, modelling requires <btnPrimary>The Treatment Train Tool</btnPrimary>